background image

Avoid over-tightening screws that fasten the polycarbonate in order 
not to damage the polycarbonate sheet and destroy its structure

7

Mount side pieces of coverage.Holding a piece of coverage, fasten it with screws and

washers by elements

6, 7, 8

and by angles using tap screws with washers. Holes for

.1

screws are drilled by boring bit of 5 mm diameter from inside of greenhouse through
holes in frame elements.

Mount cellular polycarbonate strictly facing sun with a side having

protective layer (by all means, clarify it under purchase or before

mounting). Protective layer usually is on the side with inscriptions on

transport film. On the other side of sheet film is clear. Transport film is

removed from both sides immediately before fastening coverage on the

frame.

protective layer

5х32

box

2

1

pc.

М5х35    5х32 М5

box

2

1

pc.

23

box

2

1

pc.

1

pc.   

box

2

М5х10 5х32  М5

№53

box

3

1

pc.

2

8

inside view

1

pc.

М5х10  М5

box

2

18

box

2
2

pc.

box

2

1

pc.

М

5

х

35    5

х

32 

М

5

Install reinforcing elements of door opening.

17

Summary of Contents for ARROW GH120025

Page 1: ...01 03 2022 Manual for Greenhouse ARROW...

Page 2: ...Height 2 47 m width 2 6 m...

Page 3: ...reenhouse Length m covered area m2 2 m 5 2 m2 4 m 10 4 m2 6 m 15 6 m2 8 m 20 8 m2 The greenhouse frame is made of zinc coated iron and assembled with screws and nuts The greenhouse is fixed to the gro...

Page 4: ...ash the panel with a mild soap solution or household detergent and warm water using a soft cloth or sponge to remove dirt 3 Rinse with cold water and wipe with a soft cloth Do not use abrasives or hig...

Page 5: ...on length m q ty pcs 6 1 Stand 0 35 m 10 7 3 Support 0 2 m 10 8 5 Butt end upper strainer 1 22 m 2 9 6 Butt end lower strainer 0 82 m 6 10 7 Bottom door opening stand 0 47 m 4 11 9 Horizontal strainer...

Page 6: ...etal fastening band 3 27 Bottom metal fastening band 6 28 Hinge 8 29 Semi finished rotator with 2 elastic headers 4 30 Tube bend spinner 1 31 Handle 8 32 Pin 4 33 Adhesive tape 1 34 Double sided tape...

Page 7: ...rking view denomination length m q ty pcs 48 2 Balk 0 96 m 20 49 14 Small door diagonal 0 9 m 4 50 15 Large door diagonal 0 97 m 4 51 19 Window horizontal element 0 67 m 4 52 20 Window vertical elemen...

Page 8: ...ontal strainer 1 27 m 2 7 10 Side brace 1 06 m 8 8 11 Brace spreader 0 25 m 4 9 18 Reinforcement nogging piece 0 25 m 4 10 Ridge cover plate 1 14 m 2 11 P Profile 1 0 m 4 12 orner of arcs 2 2 13 Top m...

Page 9: ...Technical certificate ARROW 8 BOX 1 2 BOX 2 2 24 M6 nut 4 25 6 washer 8 26 32 5 washer 16 2000 1000 Extension roof and side walls 6 pcs...

Page 10: ...ered end Some parts of the frame have free holes resulted from elements uniformity Cellular polycarbonate panels are installed with a certain surface which has a protective layer outside towards the s...

Page 11: ...1 If the greenhouse is mountedon a foundation seepara 4 4 the elements1 and 3 are not assembledand are not mounted in the subsequentassembly 6 1 box 2 1 pc 7 3 box 2 1 pc 3 1 3 1 6 3 4 1 1 3 27 box 2...

Page 12: ...inside view 24 1 pc 5 10 2 pc 5 box 2 4pc 5 10 5 box 2 box 2 1 4 box 1 2 pc 4 4 5 4 4 8 8 4 4 5 8 2 2 box 2 2pc 5 10 5 4pc 5 10 5 box 2 23 box 2 2 pc 23 2 2 pc box 3 8 box 1 2 pc 5 4 4 4 23 box 2 2 pc...

Page 13: ...2 2 3 4pc 5 10 5 box 2 32 box 2 1 pc 6pc 5 10 5 box 2 5pc 5 10 5 box 2 10 7 2 2 pc box 9 6 box 2 3 pc 4 4 4 4 4 4 1 1 4 4 1 4 1 4 3 1 2 4 box 1 2 pc 1 4 box 1 2 pc 24 box 2 1 pc 2pc 5 10 5 box 2 box...

Page 14: ...2pc 5 10 5 box 2 6pc 5 10 5 box 2 17 18 box 2 2 pc 12 10 box 2 4 pc 11 9 box 2 1 pc 13 11 box 2 2 pc 4 1 2 2 2 2 2 2 2 2 2 1 4 2 6 1 4 2 4 2 2 10 1 48 2 box 3 10 pc 2pc 5 10 5 box 2 2pc 5 10 5 box 2 2...

Page 15: ...3 L1 L2 60 21 L the length of a greenhouse through the arcs central axes N quantity of greenhouse s sections L 2000 2000 N mm 1000 1000 1000 1000 859 858 859 LT 2060 2000 N mm 14 The arrangementplan s...

Page 16: ...cover surface on the ventilating window with washers letting the cover surface out in one side covering the cellular structure beforehand 2 by sticking scotch tape on it Weather strips are installed a...

Page 17: ...n the doorwith washers lettingthe cover surface 2 out in one side covering the cellularstructure beforehand by sticking scotch tape on it Weather strips are installed along the contour of doors 2pc 5...

Page 18: ...rame elements Mount cellular polycarbonate strictly facing sun with a side having protective layer by all means clarify it under purchase or before mounting Protective layer usually is on the side wit...

Page 19: ...nd then install weather strips 22 6 m box 2 4 4 7 3 7 2 Place the butt end strap 16 onto butt end cover surface and fasten it onto part 5 through the surface Under part 16 there is a joint between par...

Page 20: ...sides immediately before fixing the cladding on the frame Sections of polycarbonate with open honeycombs should be covered by adhesive tape 9 1 Rotator for locking the window is installing similarly 8...

Page 21: ...r surface of the upper polycarbonate sheet for bending on the ridge middleof sheet 9 4 9 5 2 pc 4 35 4 box 2 do not fully tighten 2 6 2 33 box 1 pc 1 05 m 33 box 2 1 pc 1 05 m box 2 2 pc 1 05 m 34 PK...

Page 22: ...2 pc 4 35 4 box 2 protective layer 1 pc box 2 5 35 5 32 5 9 8 protective layer tighten box 2 1 pc 5 35 5 32 5 21 9 6 9 7 2...

Page 23: ...to cut the outer surface of the upper polycarbonate sheet for bending on the ridge middleof sheet P P 6 33 box 2 1 pc 1 0 m 33 box 2 1 pc 1 0 m 2 box extension 2 pc 1 0 m EXTENSION INSERT KIT P 10 1 1...

Page 24: ...box 2 2 pc 5 14 5 2 pc 5 14 5 box 2 2 pc 5 14 5 box 2 19 box 2 2 pc 11 2 11 1 26 box 2 3 pc 6 60 box 2 1pc 6 6 6 23...

Page 25: ...ation please visit www dancovershop com Contact information Austria Belgium Croatia Denmark Estonia Finland France Germany Ireland Italy Latvia Lithuania Nederland Norway Poland Portugal Spain Sweden...

Reviews: