background image

Technical certificate «ARROW»

Operation rules

 

Before assembling please check to ensure all parts shown in the supply set have been 

received. When installing the greenhouse or using a third party, the buyer should check 

the assembly quality to ensure compliance with the assembly manual instructions. 

Install the greenhouse at least 2 metres from buildings and at least 2 metres  from the 

canopy of trees. 

The greenhouse is designed to withstand the wind speed no more than 24 m/sec. 

In winter, coverage of greenhouse should not be removed provided that snow load is limited. 

Should  greenhouse  be  unattended  all  winter  period,  buyer  should  either  remove  the 

coverage or estimate possible snow load. Ultimate load for the frame having complete box with 

installed  drawbars  and  side  braces  appears  under  450  kg  snow  cover  per  1  m

2

  of 

horizontal ground surface corresponding to 2.25 m fresh snow layer or 1.1 m packed snow 

layer. 

Cleaning and washing polycarbonate panels 

1.

Rinse the panel with warm water.

2.

Wash the panel with a mild soap solution or household detergent and warm water, using a

soft cloth or sponge to remove dirt.

3.

Rinse with cold water and wipe with a soft cloth.

Do not use abrasives or highly alkaline cleaning agents to clean polycarbonate panels.

Dry wiping of the  surface  will  damage  the  protective  layer of  the glazing  and  shorten  its 

effective life. Do not rub the surface of polycarbonate panels with brushes, metallic fabric 

or  other  abrasive  materials.  When  disinfecting  a  greenhouse  from  pathogens  of  fungal 

and bacterial diseases, do not apply sulfur candles to avoid corrosion of the frame. 

Warranty  liabilities 

Claim submission period is 24 months from the date of purchase. Warranty does not apply to 

cases if: 

1.

Installation of the structure in violation of the requirements of the instructions.

2.

Violation of the operating rules.

3.

Misuse of the structure.

4.

The presence of corrosion traces on the cutoffs of parts, because this does not affect

the performance of the structure.

5.

Greenhouse deformations due to excess of snow load stated in the technical certificate

of the greenhouse.

6.

Greenhouse deformations due to soil movement.

7.

Floods, hurricanes, and other natural disasters.

Summary of Contents for ARROW GH120025

Page 1: ...01 03 2022 Manual for Greenhouse ARROW...

Page 2: ...Height 2 47 m width 2 6 m...

Page 3: ...reenhouse Length m covered area m2 2 m 5 2 m2 4 m 10 4 m2 6 m 15 6 m2 8 m 20 8 m2 The greenhouse frame is made of zinc coated iron and assembled with screws and nuts The greenhouse is fixed to the gro...

Page 4: ...ash the panel with a mild soap solution or household detergent and warm water using a soft cloth or sponge to remove dirt 3 Rinse with cold water and wipe with a soft cloth Do not use abrasives or hig...

Page 5: ...on length m q ty pcs 6 1 Stand 0 35 m 10 7 3 Support 0 2 m 10 8 5 Butt end upper strainer 1 22 m 2 9 6 Butt end lower strainer 0 82 m 6 10 7 Bottom door opening stand 0 47 m 4 11 9 Horizontal strainer...

Page 6: ...etal fastening band 3 27 Bottom metal fastening band 6 28 Hinge 8 29 Semi finished rotator with 2 elastic headers 4 30 Tube bend spinner 1 31 Handle 8 32 Pin 4 33 Adhesive tape 1 34 Double sided tape...

Page 7: ...rking view denomination length m q ty pcs 48 2 Balk 0 96 m 20 49 14 Small door diagonal 0 9 m 4 50 15 Large door diagonal 0 97 m 4 51 19 Window horizontal element 0 67 m 4 52 20 Window vertical elemen...

Page 8: ...ontal strainer 1 27 m 2 7 10 Side brace 1 06 m 8 8 11 Brace spreader 0 25 m 4 9 18 Reinforcement nogging piece 0 25 m 4 10 Ridge cover plate 1 14 m 2 11 P Profile 1 0 m 4 12 orner of arcs 2 2 13 Top m...

Page 9: ...Technical certificate ARROW 8 BOX 1 2 BOX 2 2 24 M6 nut 4 25 6 washer 8 26 32 5 washer 16 2000 1000 Extension roof and side walls 6 pcs...

Page 10: ...ered end Some parts of the frame have free holes resulted from elements uniformity Cellular polycarbonate panels are installed with a certain surface which has a protective layer outside towards the s...

Page 11: ...1 If the greenhouse is mountedon a foundation seepara 4 4 the elements1 and 3 are not assembledand are not mounted in the subsequentassembly 6 1 box 2 1 pc 7 3 box 2 1 pc 3 1 3 1 6 3 4 1 1 3 27 box 2...

Page 12: ...inside view 24 1 pc 5 10 2 pc 5 box 2 4pc 5 10 5 box 2 box 2 1 4 box 1 2 pc 4 4 5 4 4 8 8 4 4 5 8 2 2 box 2 2pc 5 10 5 4pc 5 10 5 box 2 23 box 2 2 pc 23 2 2 pc box 3 8 box 1 2 pc 5 4 4 4 23 box 2 2 pc...

Page 13: ...2 2 3 4pc 5 10 5 box 2 32 box 2 1 pc 6pc 5 10 5 box 2 5pc 5 10 5 box 2 10 7 2 2 pc box 9 6 box 2 3 pc 4 4 4 4 4 4 1 1 4 4 1 4 1 4 3 1 2 4 box 1 2 pc 1 4 box 1 2 pc 24 box 2 1 pc 2pc 5 10 5 box 2 box...

Page 14: ...2pc 5 10 5 box 2 6pc 5 10 5 box 2 17 18 box 2 2 pc 12 10 box 2 4 pc 11 9 box 2 1 pc 13 11 box 2 2 pc 4 1 2 2 2 2 2 2 2 2 2 1 4 2 6 1 4 2 4 2 2 10 1 48 2 box 3 10 pc 2pc 5 10 5 box 2 2pc 5 10 5 box 2 2...

Page 15: ...3 L1 L2 60 21 L the length of a greenhouse through the arcs central axes N quantity of greenhouse s sections L 2000 2000 N mm 1000 1000 1000 1000 859 858 859 LT 2060 2000 N mm 14 The arrangementplan s...

Page 16: ...cover surface on the ventilating window with washers letting the cover surface out in one side covering the cellular structure beforehand 2 by sticking scotch tape on it Weather strips are installed a...

Page 17: ...n the doorwith washers lettingthe cover surface 2 out in one side covering the cellularstructure beforehand by sticking scotch tape on it Weather strips are installed along the contour of doors 2pc 5...

Page 18: ...rame elements Mount cellular polycarbonate strictly facing sun with a side having protective layer by all means clarify it under purchase or before mounting Protective layer usually is on the side wit...

Page 19: ...nd then install weather strips 22 6 m box 2 4 4 7 3 7 2 Place the butt end strap 16 onto butt end cover surface and fasten it onto part 5 through the surface Under part 16 there is a joint between par...

Page 20: ...sides immediately before fixing the cladding on the frame Sections of polycarbonate with open honeycombs should be covered by adhesive tape 9 1 Rotator for locking the window is installing similarly 8...

Page 21: ...r surface of the upper polycarbonate sheet for bending on the ridge middleof sheet 9 4 9 5 2 pc 4 35 4 box 2 do not fully tighten 2 6 2 33 box 1 pc 1 05 m 33 box 2 1 pc 1 05 m box 2 2 pc 1 05 m 34 PK...

Page 22: ...2 pc 4 35 4 box 2 protective layer 1 pc box 2 5 35 5 32 5 9 8 protective layer tighten box 2 1 pc 5 35 5 32 5 21 9 6 9 7 2...

Page 23: ...to cut the outer surface of the upper polycarbonate sheet for bending on the ridge middleof sheet P P 6 33 box 2 1 pc 1 0 m 33 box 2 1 pc 1 0 m 2 box extension 2 pc 1 0 m EXTENSION INSERT KIT P 10 1 1...

Page 24: ...box 2 2 pc 5 14 5 2 pc 5 14 5 box 2 2 pc 5 14 5 box 2 19 box 2 2 pc 11 2 11 1 26 box 2 3 pc 6 60 box 2 1pc 6 6 6 23...

Page 25: ...ation please visit www dancovershop com Contact information Austria Belgium Croatia Denmark Estonia Finland France Germany Ireland Italy Latvia Lithuania Nederland Norway Poland Portugal Spain Sweden...

Reviews: