background image

 

 
 
 

2.2. 

Components 

 

 

 

N. 

 

DESCRIPTION 

 

 

ALUMINIUM PROFILE MM 45X15 

 

ALUMINIUM PROFILE (gables) 

 

 

 

SQUARED HOLDING DEVICE 

 

SQUARED HOLDING DEVICE CAP 

 

ANODIZED ALUMINIUM 120x60 FOOT 

 

PVC COVERSOL/FABRITARP TOP COVER 

 

 

ALUMINIUM LACQUERED RAL 9010 PLATE (crosses) 

 

ALUMINIUM LACQUERED RAL 9010 PLATE (tension bars) 

 

NYLON ROPE DIAM. MM 5 

10 

 

STRING FASTENER HANDLE 

11 

 

HINGE FASTENING RIVET 

12 

 

TENTMESH LATERAL COVER (only for Box Modulare) 

13 

 

FOOT WITH FINAL HINGE 

14 

 

FOOT WITH CENTRAL HINGE 

15 

 

FOOT WITH HINGE FOR HEAD-FASTENING PLATE 

 

 

 

Summary of Contents for CA119011

Page 1: ...06 07 2017 for Folding Garage Car 2 5x5 4x2m Manual...

Page 2: ...ic s characteristics 8 3 INSTALLATION 10 3 1 Handling and transport 10 3 2 Place and requirements for the installation 10 3 3 Installation 10 3 3 1 Package opening 10 3 3 2 Squared holding devices pla...

Page 3: ...nual you will find the instructions to correctly install the box understand the functions of the box and of the whole thereof correctly do the box scheduled maintenance processes take care of the basi...

Page 4: ...it its use in these conditions can cause damages to people and things It is particularly important for safety not to hang or apply any type of load at the structure or at the top cover of the box In...

Page 5: ...120x60 FOOT 6 PVC COVERSOL FABRITARP TOP COVER 7 ALUMINIUM LACQUERED RAL 9010 PLATE crosses 8 ALUMINIUM LACQUERED RAL 9010 PLATE tension bars 9 NYLON ROPE DIAM MM 5 10 STRING FASTENER HANDLE 11 HINGE...

Page 6: ...6...

Page 7: ...7 10 8 7 12 9...

Page 8: ...rn cm Weft 16 yarn cm Fabric s weight Ca 400 gr m2 Tensile strength Warp Ca 120 DaN 5 cm DIN 53354 Weft Ca 130 DaN 5 cm Tearing resistance Warp Ca 5 5 DaN DIN 53363 Weft Ca 7 5 DaN Grip ISO 2411 Ca 6...

Page 9: ...ting PVC Fabric s weight Ca 450 gr m2 Tensile strength Warp Ca 250 DaN 5 cm DIN 53354 Weft Ca 180 DaN 5 cm Tearing resistance Warp Ca 25 DaN DIN 53363 Weft Ca 25 DaN Hot cold resistance 70 C 30 C Fini...

Page 10: ...ny permits required by local regulations appropriate ground 3 3 Installation Before starting the installation if electrical equipment utilization is needed make sure you do not work in wet areas use o...

Page 11: ...by the customer in a parallel position photo 2 NOTE The fixation to the ground must be done according to the type of ground and the localization of the box 3 3 3 Box installation The central part of...

Page 12: ...s must be screwed in the holes photo 5 and 6 The lateral crosses must be positioned photo 7 and 8 Only after this operation the uprights can be fixed to the feet photo 9 12 P H O T O 5 P H O T O 6 P H...

Page 13: ...strong wind 4 BOX UTILIZATION Before using the box you need to check that installation and ground fixation operations have been carried out properly The snails can be opened and closed easily by simp...

Page 14: ...articular the fixing systems strings of the snails must be periodically verified If some fissures and tears are present the strings must be substituted The top cover can be washed with neutral deterge...

Page 15: ...0 germany dancover com Switzerland 0840 000125 schweiz dancover com France 0975 181 800 france dancover com Austria 0662 626935 austria dancover com Sweden 040 233 262 sverige dancover com Finland 0 9...

Reviews: