Description

    Greenhouse STRONG is designed for creation microclimate favorable for growing garden crops on 

cottage and household plots.  

Greenhouse  might  have  variable  length  depending  on  customers’  desire.  Required  length  of 

greenhouse is provided by purchasing of packages with extending inserts. Each insert add 2m to base 

length. Base length is 4m. Height of installed frame is 2.1 m

The frame of the greenhouse is made of galvanized iron and is to be assembled with screws and 

angles.  Complete  set  includes  all  that  is  needed  for  fastening  of  coverage.  Greenhouse  may  be 

completed  with  coverage  on  buyer’s  request.  Greenhouse  has  two  door  openings  and  two  small 

windows in opposite ends.

Greenhouse base requires 3 sheets of cellular polycarbonate 2.1*6m with 6mm thickness. For 

each Inserts - 1 sheet of cellular polycarbonate 2.1*6m

Perform assembling and operation of the greenhouse in strict accordance with 
the manual and operating rules stated in the technical certificate. Please keep 
this technical certificate for further reference.

The company reserves the right to make changes in the greenhouse design

!

Operation rules

Before the start of operation, the greenhouse should be assembled and installed as prescribed in 

the manual. When the greenhouse is assembled by a third party the customer should supervise the 

quality of works to ensure compliance with the present manual. Some detail have extra holes due 

to uniformity of details. During assembly, be careful not to damage the parts, because until they 

a diameter of 4mm or mandrel with a conical end. During assembly of the frame details’ connections  

assembly rules and cause of removal warranty support by manufacturer.

Do not install the greenhouse too close to buildings or trees where masses of snow/ice can fall on it. 

Recommended distance is at least 2 m. The greenhouse is designed to withstand wind at the speed 

below 24 m/sec. The greenhouse cladding should not be removed for the winter period if snow load is 

limited. If the greenhouse is left unattended for the entire winter the customer should either remove 

the cladding or estimate the possible snow load. For the frame assembled with all parts including 

strainers and braces, the maximal snow load begins when the layer of snow weight is 180 kg per 1 

sqm of horizontal surface, which corresponds to regulative snow load of IV snow region (in accordance 

against snow load in the following areas: Northen  areas in Russia, the Scandinavian countries: 

Finland, Sweden,

Norvey, Denmark. 

Warranty liabilities

1. The manufacturer is responsible for the completeness of the product. 

2.  The  manufacturer  is  responsible  for  assemblability  of  the  greenhouse  in  accordance  with  the 

instructions.

4. Term for making claims is 24 months from the day of purchase

Terms of warranty provisions

Cleaning and washing sheets of polycarbonate.

Warranty does not apply to cases of:

1. Greenhouse installation in violation of instruction requirements 

2. Violation of the rules of operation.

3. Inappropriate use of the greenhouse.

4. Deformation of the greenhouse as a result of ground movement. 

5. Floods, hurricanes and other natural disasters.

1. Rinse the sheet with warm water.

2. Wash the sheet with a solution of mild soap or with a household detergent and warm water, 

using a soft rag or a sponge to remove dirt.

3. Rinse with cold water and wipe with a soft cloth.

Never  use  abrasives  or  highly  alkaline  cleaning  compositions  for  cleaning  polycarbonate 

sheets. Dry rubbing of the surface will damage the protective layer of the cladding and shorten 

its shelf life. Never rub the surface of polycarbonate sheets with brushes, metallic cloth or other 

abrasive materials.

When disinfecting the greenhouse from pathogens causing fungal and bacterial diseases, do 

not use «sulfur blocks» to avoid frame corrosion (blackening).

Summary of Contents for DUO 12 M2

Page 1: ...19 12 2019 for Greenhouse STRONG Manual...

Page 2: ...3 0m 2 1m any length multipple to 2m min 4m...

Page 3: ...on it Recommended distance is at least 2 m The greenhouse is designed to withstand wind at the speed below 24 m sec The greenhouse cladding should not be removed for the winter period if snow load is...

Page 4: ...18 L 1 1 6 19 L 0 99 6 20 L 0 34 6 21 L 0 35 6 22 end amplifier 4 Box 1 DETAILED PARTS LIST BASE Box 2 2 L 0 96 24 3 L 0 14 14 5 L 0 09 4 8 L 1 04 4 10 L 0 82 4 11 L 1 02 2 11 L 1 02 2 12 L 0 756 8 1...

Page 5: ...33 self tapping screw 6 34 Nut M4 748 46 seal loop 3 7 47 seal door 10 48 seal side wall 12 35 Washer 160 36 tape 1 37 workpiece for locking turner with 2 elastic nozzles 4 38 bolt 6 60 10 39 nut M6...

Page 6: ...1 62 4 4 L 1 62 2 17 L 1 4 2 18 L 1 1 4 19 L 0 99 4 20 L 0 34 4 21 L 0 35 4 28 Screw 4 8 184 31 Screw 4 25 24 34 Nut M4 208 35 Washer 16 45 profile L 1 0 4 49 top bandage 2 50 bottom bandage 4 38 bol...

Page 7: ...11 10 2 2 2 2 4 2 2 2 4 4 4 M4x8 2 2 M4x8 2 2 2 2 2 3 2 2 4 2 4 2 2 2 2 4 4 M4x8 2 2 M4x8 4 4 4 4 5 4 4 2 4 2 2 4 2 2 2 2 2 2 2 2 4 4 4 M4x8 2 2 M4x8 4 4 M4x8 4...

Page 8: ...13 12 6 7 10 2 2 2 2 2 2 2 2 1 1 3 3 3 3 1 M4x8 screw 4 8 bottom bandage 1 3 8 1 1 1 1 1 1 1 1 1 1 1 4 2 2 2 2 2 2 2 2 9 4 4 M4x8...

Page 9: ...15 14 10 9 2 11 8 10 10 9 2 11 10 8 9 1 9 1 3 9 1 2 2 M4x8 4 4 M4x8 4 4 M4x8 2 2 M4x8 8 8 11 4 4 11 9 2 9 2 10 9 1 1 2 2 2 M4x8 2 2 M4x8 2 2 M4x8 2 2 M4x8...

Page 10: ...17 16 11 1 8 1 8 1 9 1 8 1 9 1 1 9 17 17 21 2 2 21 20 20 2 2 2 4 4 4 1 4 4 6 6 M4x8 2 2 M4x8 4 4 M4x8 17 1 8 1 8 1 9 1 9 1 9 1 8 2 2 21 21 20 2 2 2 4 4 1 1 4 4 4 20 6 6 M4x8 2 2 M4x8 4 4 M4x8...

Page 11: ...9 2 2 9 2 1 1 M4x8 1 1 M4x8 1 1 M4x8 1 1 M4x8 14 N13 13 13 N12 12 12 N12 N16 16 N13 2 2 M4x8 4 4 M4x8 13 13 13 13 12 12 12 12 12 12 N15 N15 N14 N14 1 5 1 5 15 1 5 1 5 1 5 1 4 1 4 14 1 4 N13 N13 N13 N...

Page 12: ...r marking the sheet but prior to its cutting make a mark on the protected side of the sheet for each piece after removal of the transport film sheet sides are not visually different The transport film...

Page 13: ...23 22 18 5 2 1 M4x10 2 2 1 M4x10 2 4 M4x10 4 1 1 M4x25 1 20 25 M4x25 7 7 7 1 2 1 1 19 9 1 M4x25 1 1 1 1 1 1 1 1 M4x10 1 1 1 M4x25 15 15 15 M4x35 16 16 16...

Page 14: ...tective layer is usually at the side with the inscriptions on the transport film The film on the other side of sheet is transparent After marking the sheet but prior to its cutting make a mark on the...

Page 15: ...27 26 24 23 2 M4x25 2 Do not fully tighten 1 1050 25 4 4 M4x25 4 26 M6x60 M6 1 2 1 1...

Page 16: ...29 28 27 1 2 M4x25 2 1 m 1000 28...

Page 17: ...31 30 866 4060 1000 1000 1000 1000 2988 FOR INSTALLING ON FUNDAMENT 1061 60 60 21 21...

Page 18: ...0 germany dancover com Switzerland 0840 000125 schweiz dancover com France 0975 181 800 france dancover com Austria 0662 626935 austria dancover com Sweden 040 233 262 sverige dancover com Finland 0 9...

Reviews: