4
M4.2X16
Z08
8
Ø
4X16D
Z02
2
M01
M6
2
Ø
4X8
Z04
22
L25
L25
J93
J92
Z08
J90L/R
L14
Z04
S01
M01
PART
NO
QTY
L25
4
J93
4
J92
4
J55
2
2
2
J56R
J56L
J94
4
J90R
J90L
1
1
J55
L23F
2
L23F
L23F
Z02
J56L/R
J94
L25
1
2
3
4
5
2
2
3
3
4
5
4
5
6
L23F
J55
J56R
J56L
J90L
J90R
J94
L25
J93
6
Fix the cover caps J55
into the ridge profile
Fix L23F (2pcs), one end to L14
and the other end to L09D through
J56L/R, using the S01 preloaded
and M01.
Fix the cover caps (J90L/R)
carefully with Z04.
Fix the cover caps
(J56L/R) carefully
with Z02. Be careful
to ensure that the
screws are driven in
straight and in the
correct position
(see detail drawings).
Drill a hole in L01A/L01B,
approximately 3mm diameter
and 700mmup from the bottom.
Fix the J92 downpipebracket
with Z08 screws and then clip
the L25 downpipe into the
J92 bracket.
If you wish to eliminate
leaksuse glue when fixing
the downpipebends
(not provided).