Starting from the bottom, fix the second arch to reinforcement of side arches
(NR. 11) and reinforcement of arches – crossbars (NR. 6) with screws M5-12 (12)
and screws (15), which can be assembled by parts, screwing to the current frame,
or by screwing in advance assembled arch (sequence in paragraph Nr. 1). The
assembled fragment from two arches with fixtures raise from the ground and put
up vertically.
VIEW FIGURE 9.
6.
The assembled front and rear parts connect together uniting one with
another through reinforcement of arches – crossbars (NR. 6). Insert the last fifth
arch, which can be assembled in parts, tightening to the existing carcass, or by
screwing in advance assembled arch (sequence in paragraph Nr. 1). The arch and
fixtures are collated and fixed with screws M5-12 (12) and screws (15) through all
three parts.
VIEW FIGURE 10.
For greater than 12m2 (4 meters) greenhouse
TITAN Arch 280
greenhouse extension kits are used, each of which is equal to 2 meters.
If the length of a greenhouse is 6 meters – than a greenhouse is connected as
follows: 4m + 2m extension.
If the length of a greenhouse is 8 meters – than a greenhouse is connected as
follows: 4m + 2m ext 2m extension.
If the length of a greenhouse is 10 meters – than a greenhouse is connected as
follows: 4m + 2m extension + 2m extension + 2m extension. And etc. VIEW
extension drawing (p.29).
7.
Installation of greenhouse fixtures. Reinforcement profiles (NR. 7) are
inserted in each inner arch on the left and right sides. They are fixed at the bottom
with screws M5-12 (12) and screws (15) through all three parts, and at the top with
M5-12 (12) and screws (15).
VIEW FIGURE 11.
8.
Fixation angles of polycarbonate (18) are screwed on to rear parts of
reinforcement of arches – crossbars (NR. 6) at the front and end.
VIEW FIGURE
12.
9.
Excavate pits (25 cm in diameter, 40 cm of deepness) for embedding of
side lower arch stands (NR. 3) over the entire ground perimeter.
Place the collected
greenhouse carcass into the excavated pits, measure the diagonal with a rope
(diagonals should be equal), check the camber of side arches (they have to be
vertical) and tighten the carcass of a greenhouse.
10.
After assembling the carcass part of a greenhouse, cut the polycarbonate
according to the provided dimensions and attach it to the carcass. Fix cut
polycarbonate sheets (polycarbonate cutting scheme -1-, -2-, -3-, -4-, -8-, -9-) at
designated areas to corners of polycarbonate and stand reinforcement with screws
M5-20 (14), screws M5 (15) and interims (16). To doors-windows stand and
crossbar (NR. 8, NR.10) as well as to side reinforcements of the front-rear part
(NR. 9 and NR. 5) with screws M5-40 (13), screws M5 (15) and interims (16).
NOTE: if side parts of the polycarbonate protrude above the carcass part
of arches, align them by cutting equally.
Summary of Contents for TITAN Arch 280
Page 1: ...12 04 2019 for Greenhouse TITAN Arch 280 Manual...
Page 2: ......
Page 10: ...REAR AND FRONT 2X...
Page 11: ...REAR AND FRONT 2X...
Page 12: ...REAR AND FRONT 2X...
Page 13: ...FRONT 1X...
Page 14: ...FRONT 1X...
Page 15: ...FRONT 1X...
Page 16: ...REAR 1X...
Page 17: ...REAR 1X...
Page 18: ...REAR 1X...
Page 19: ......
Page 20: ......
Page 21: ...ANGLES FIXATION IN FRONT AND REAR...
Page 22: ......
Page 23: ...POLYCARBONATE FIXATION IN REAR...
Page 24: ...PROTECTIVE SEALING TAPE FIXATION IN FRONT AND REAR...
Page 25: ...POLYCARBONATE FIXATION ON THE TOP...
Page 26: ......
Page 27: ...DOOR FIXATION Doors...
Page 28: ...Foil Handle...
Page 29: ...2M EXTENSION...