Installation procedure
Prepare and level the greenhouse installation site according to the dimensions of the greenhouse
purchased.
The installation instructions will describe how to install a 4 m long “TITAN Arch+
” greenhouse.
In this case, we present a scheme for digging or drilling holes in the ground at the edges of a prepared
rectangle along the entire perimeter of a greenhouse with dimensions of ~ 25 cm in diameter, ~ 40 cm in
depth.
1.
Disassemble the received metal profile packages; check the contents,
, and length of the
received parts with a list of parts. Separate and comfortably lay out the individual parts.
ATTENTION! The components of the arch are different! The arch parts that have more mounting
holes are used to form the front and back arches of the greenhouse.
2.
For assembling the foundation base, we use the front and rear parts of the foundation base (1515 mm
long, No 17) and the lateral parts of the foundation base (2010 mm No 16 and 1990 mm No 15), foundation
corners (No18), plates (No19) and bolts with nuts.
A)
Join the front parts of the foundation base (1515mm No 17 + 1515mm long No 17) with plates
(No19) on both sides, and secure with M5-16 bolts and nuts. The same action is performed with
a rear part.
SEE Fig. 1
B)
Connect the lateral parts of the foundation base (2010 mm No 16 and 1990 mm No 15 long)
with the plates (No19) on both sides and secure with bolts M5-40, M5-16, and nuts. The same action is
performed with both side parts.
NOTE: For additional connection of the side parts, we use the bottom arch studs
(940mm long, No5), with the anchors already inserted into the ground (200mm long, No 7) (SEE Fig.
2), which we attach to the side foundation base through the foundation connection plate with M5-40
bolts and M5 nuts.Use two bolts for all three parts, and where the plates are attached directly to the
foundation, use bolts M5-16 with nuts. SEE Fig. 3.
C)
Assemble all of these connected parts into a rectangle using the foundation base corners
(No 18) by screwing with bolts M5-40, M5-16 and nuts.
SEE Fig. 4.
Note: For additional connection of corners, we use lateral bottom arch studs containing the maximum
number of holes (940mm long, No 6) with the anchors already inserted into the ground (200mm long,
No 7) (SEE Fig. 2), which are attached to the side foundation through the narrow corner of the
foundation base with bolts M5-40 and nuts M5. Two bolts are used for all three parts. The same action
is performed in the remaining three corners.
For a greenhouse of 6 m in length, the foundation base shall be connected as follows:
2010 mm (No 16) + 1990 mm (No 15) + 1990 mm (No 15). The parts shall be connected in the same
manner as described in the second clause of part C.
For a greenhouse of 8 m in length, the foundation base shall be connected as follows:
2010 mm (No 16) + 1990 mm (No
15) + 1990 mm (No 15). The parts shall be connected in the same manner as described in the second clause
of part C, etc.
3.
Measure the diagonal of the foundation base. The diagonal lengths should be
If the diagonal
matches, tighten the foundation base screws all the way.
SEE Fig. 5.
4.
Fix the polycarbonate mounting plates (No.33) to the top of the front and rear foundation base
parts using bolts M5-16 and nuts. Two plates shall be mounted on the front, three plates on the rear part.
SEE Fig. 6. NOTE: If purchased with an additional door, the panel is not mounted in the centre at the
rear part of the panel.
5.
Fix the fastening elements to the ground (200mm long, No. 7) to the rest of the unused side bottom
arch studs (940mm long, No.5) using M5-45 bolts and M5 nuts.
SEE Fig. 2
6
Summary of Contents for TITAN Arch+ 320
Page 1: ...04 03 2020 for Greenhouse TITAN Arch 320 Manual ...
Page 2: ......
Page 3: ...2 ...
Page 5: ...4 ...
Page 6: ...Polycarbonate cutting scheme 5 ...
Page 8: ...7 ...
Page 9: ...8 ...
Page 10: ...9 ...