background image

27

26

Manual

Manual

FASTENING OF COVERING

FASTENING OF COVERING

1

Bore  out  holes  in 
detail  №1  according 
to  holes  in  bottom 
draw band

bottom draw band

100 мм

top draw 

band

top draw 

band

bottom draw 

band

nut  М6 

washer 6 

bolt М6х60

washer 6

bend  the  ends  of  the  tingle  after 
tightening of the draw band

          

Top draw 

band

bottom 

draw 

band

ase sheet 

for a runner

main shape

bolt М6х14

Top draw 

band

tingle

Arc base 

sheet

washer 6

nut М6

straighten the 
ends of the tingle 

          

nut М6

(from the base 
package) 

bolt М6х20 

(from the base 
package) 

washer 32х6

(from the base package) 

washer 6

(from the base 
package) 

Summary of Contents for TITAN Peak 240 5,0

Page 1: ...for Greenhouse TITAN Peak 240 5 0 Manual 17 02 2020...

Page 2: ...any length multiple of 2 1 min 4 2 m width 5 0 m height 3 6 m...

Page 3: ...GE TITAN Peak 240 90 75 2800 10 5 3 PACKAGE TITAN Peak 240 90 120 1990 32 36 4 PACKAGE TITAN Peak 240 90 65 2360 11 12 5 PACKAGE TITAN Peak 240 90 70 2720 17 10 6 PACKAGE TITAN Peak 240 90 55 1145 2 6...

Page 4: ...26 End seal 1 19 9 PACKAGE TITAN Peak 240 Outermost ridge 2 2 1 able 3 DETAILED PARTS LIST INSERT marking name quantity pcs length m 1 PACKAGE INSERT 20 Ridge arc 2 1 76 4 Arc 2 3 1 2 PACKAGE INSERT...

Page 5: ...tom arc base sheet 2 2 91 Outermost base sheet for a runner 2 2 04 Tingle 20 0 09 Main shape 2 2 10 Washer 32 6 12 Bolt 6 14 34 Bolt 6 20 12 Bolt 6 60 2 Nut 6 48 Washer 6 50 Double size scotch tape 1...

Page 6: ...ding outside of the greenhouse in front the door d e l b m e s s a s i e s u o h n e e r g e h T s e r u g i f n i n w o h s d n a d e r e t t e l e r a s t i n u y l b m e s s A by means of bolts of...

Page 7: ...1 1 5 5 5 4 3 9 10 4 4 4 2 2 2 2 2 2 26 26 11 ONE INSERT extends the greenhouse by 2 13 m Number of the inserts for the greenhouse is not limited Fig 1 GENERAL VIEW OF THE GREENHOUSE FRAME WITH EXTEN...

Page 8: ...al view of the end wall angle 11 10 9 sunken screw 6 10 Determine the places of installation of angles in accordance with fig 1 8 and install the angles together with the strip 11 10 9 Strips with the...

Page 9: ...st side walls of shapes of arcs 4 until the next operation bolt angle fig 4 2 Installation of longitudinal stiffness side braces STAGE 4 Fig 4 1 2 STAGE 3 Assembly of the power arc Assembly of the pow...

Page 10: ...tical position on the prepared place 200 2042 2132 L 4084 2132 N 2132 2042 fig 5 1 Fig 5 2 5000 200 84 100 200 200 45 42 100 N number of sections of the greenhouse excluding end sections ref p 2 2 STA...

Page 11: ...embly The gate is assembled in the same way Joints are shown in the figures Strips and other surface mounted components are installed after the main shape parts are assembled STAGE 7 13 12 14 12 13 sc...

Page 12: ...0 cutting line 1490 1490 Install honeycomb polycarbonate with a specified side facing outwards sunward this side has a covering layer make sure to clarify it on buying or prior to installation Coverin...

Page 13: ...the end to the angles with the use of washers and self tapping screws fig 8 2 Places of fastening of pieces of covering to each other with the use of a permanent polycarbonate connecting shape are sho...

Page 14: ...gles on arcs 2430 2430 2 1 0 0 nut 6 Ridge shape bolt 6 20 big arc base shee small arc base sheet washer 32 6 Do not tighten up 2 3 5 0 double size scotch bolt 6 14 outermost base sheet for a runner o...

Page 15: ...raw band nut 6 washer 6 bolt 6 60 washer 6 bend the ends of the tingle after tightening of the draw band Top draw band bottom draw band ase sheet for a runner main shape bolt 6 14 Top draw band tingle...

Page 16: ...0 germany dancover com Switzerland 0840 000125 schweiz dancover com France 0975 181 800 france dancover com Austria 0662 626935 austria dancover com Sweden 040 233 262 sverige dancover com Finland 0 9...

Reviews: