KSLi arrays and assembly procedures
3.1 Setup preparation
Check the acoustical and mechanical setup using ArrayCalc and
prepare enough printouts for each array. Alternatively, the
ArrayCalc Viewer App can be used for this purpose.
The plan enables the riggers to set up the suspension points, the
securing points and the chain hoists.
When on site first:
▪ Clear the working areas and ensure there is enough space to
set up and lift the array.
▪ Check that the hoists are exactly in the specified position.
▪ Ensure the chains are not twisted.
Inspections before setup
Before setting up the array, carry out a visual inspection of all
system components for faults. This also includes the loudspeakers
and in particular the rigging parts of the cabinets (Front and
Splay/Rear links).
Damaged components must be withdrawn from use immediately.
Please follow the instructions given in
3.2 KSLi-TOP array
Remarks and limitations
NOTICE!
In combination with the Z5743 KSLi-TOP Mounting frame, a
maximum 10 x KSLi-TOP cabinets can be flown.
1. Suspend the Mounting frame
1. Suspend the Mounting frame according to your onsite
requirements.
2. Lift the frame to a suitable working height.
2. Prepare the first cabinet
1. Prepare the Front and Splay links of the first cabinet as
described in
Chapter 2.5.1 "Front link mechanism"
Chapter 2.5.2 "Splay/Rear link
2. Attach the T-handles and position the cabinet below the frame.
d&b KSLi Rigging manual 1.1 en
17