Assembly
Inspections before setup
Before setting up the array, carry out a visual inspection of all
system components for faults. This also includes the loudspeakers
and in particular the rigging parts of the cabinets (Front and
Splay/Rear links).
Damaged components must be withdrawn from use immediately.
Please follow the instructions given in
2.3 Order of assembly
Due to the compact size of the Y-Series TOP cabinets and the
maximum number of six cabinets that can be flown, the assembly
may be carried out either suspended or on the ground. The
following description refers to the suspended assembly.
1. Prepare the first cabinet
1. At the front release the Locking pins of the Front links.
Þ
The Front links will slide out automatically.
2. On the rear release both Locking pins and fold out the Splay
link.
2. Attach the Flying adapter
1. Attach the Flying adapter on top of the cabinet until the Front
links of the cabinet fit into the slots at the front of the adapter.
2. Insert and lock the Locking pins of the cabinet's Front links on
both sides.
d&b Z5394 Rigging manual 1.2 en
6