background image

 

3. At the rear release both Locking pins of the upper cabinet's

Splay link.

4. Fold the Splay link of the upper cabinet into the rigging strand

of the bottom cabinet.

5. Raise the upper cabinet until the hook of the Splay link hooks

into the preset Locking pin.

6. Hold the cabinet in place and insert the second Locking pin

(Safety pin) from the bottom cabinet to fix the Splay link in

place.

To add further cabinets, proceed in the same manner until the

assembly is completed.

6. Rig the cabling
Connect the cables and link cables according to the number of

amplifier channels and cabinets used.

7. Check the assembly
Recheck the actual status of the entire assembly.
▪ Check all Front links on both sides of the cabinets and ensure all

Locking pins are properly inserted and locked.

▪ Check the splay angle settings and the Splay links on the rear of

the cabinets and ensure all Locking pins are properly inserted

and locked.

2.2.2  Mixed ground stack

For this purpose, the Base plate is equipped with an M20 hand

bolt 

[2] which can be attached to the M20 threaded insert of the

respective subwoofer.

Þ

Simply fit the Base plate onto the M20 threaded insert of the

subwoofer and tighten the hand bolt.

The assembly of the Y8/Y12 cabinets on top of the subwoofer is

carried out in the same manner as described in the previous

chapter.

Horizontal alignment
In addition, the Y8/Y12 assembly on top of the Subwoofer can be

horizontally aligned to the left or to the right. However, due to the

rubber feet of the Base plate, the angle is limited to 15° since the

front rubber feet should always rest on the top panel of the

subwoofer.

Þ

To perform the alignment, slightly slacken the hand bolt, align

the assembly and retighten the hand bolt.

 

d&b Z5396 Rigging manual 1.1 en

7

Summary of Contents for Z5396

Page 1: ...Y Z5396 Rigging manual 1 1 en ...

Page 2: ...b website for the latest version of this document When reselling this product hand over this document to the new owner If you supply d b products please draw the attention of your customers to this document Enclose the relevant documents with the systems If you require additional documents for this purpose you can order them from d b d b audiotechnik GmbH Eugen Adolff Straße 134 D 71522 Backnang G...

Page 3: ...embly 5 2 1 Preparing the setup 5 2 2 Order of assembly 5 2 2 1 Y8 Y12 Ground stack 5 2 2 2 Mixed ground stack 7 3 Care and maintenance 8 3 1 Transport Storing 8 3 2 Visual and functional inspection 8 4 Declarations 9 4 1 Manufacturer s declaration 9 4 2 Disposal 9 Contents d b Z5396 Rigging manual 1 1 en 3 ...

Page 4: ... setup should only be carried out by qualified and authorized personnel observing the valid national Rules for the Prevention of Accidents RPA Always carry out a visual and functional inspection of the items before use In case there is any doubt as to the proper functioning and safety of the items these must be withdrawn from use immediately Please also refer to Þ Chapter 3 Care and maintenance on...

Page 5: ...r channels and cabinets used Inspections before setup Before setting up the array carry out a visual inspection of all system components for faults This also includes the loudspeakers and in particular the rigging parts of the cabinets Front and Splay Rear links Damaged components must be withdrawn from use immediately Please follow the instructions given in Þ Chapter 3 Care and maintenance on pag...

Page 6: ...ont of the first cabinet release the Locking pins of the Front links The Front links will slide out automatically 4 Preset the splay angle The splay angles between adjacent cabinets are defined using the central rear rigging strands of the cabinets and can be set in the range from 0 to 14 in 1 steps Þ On the first cabinet preselect the splay angle according to your ArrayCalc simulation and insert ...

Page 7: ...Check the splay angle settings and the Splay links on the rear of the cabinets and ensure all Locking pins are properly inserted and locked 2 2 2 Mixed ground stack For this purpose the Base plate is equipped with an M20 hand bolt 2 which can be attached to the M20 threaded insert of the respective subwoofer Þ Simply fit the Base plate onto the M20 threaded insert of the subwoofer and tighten the ...

Page 8: ...f personal injury and or damage to material To eliminate the potential risk of accident due to malfunctioning of a component regularly inspect all system components Base plate Visual inspection of all fitting plates for obvious damage e g cracks or corrosion Locking pins Visual inspection for deformation cracks and corrosion of the component Inspection for missing ball bearings and damage Function...

Page 9: ...chrift 17 Backnang 2014 08 05 Frank Bothe Chief Technology Officer CTO d baudiotechnik GmbH 4 2 Disposal When out of use the rigging components must be disposed of in accordance with the national environmental regulations Ensure that damaged rigging components are disposed of in a way that they cannot be used again 4 Declarations d b Z5396 Rigging manual 1 1 en 9 ...

Page 10: ...D2720 EN 01 08 2014 d b audiotechnik GmbH www dbaudio com ...

Reviews: