Cable connection
Feed the cables into the junction box and tighten the gland to a torque of 6 ft lbs
For powered splice and powered T connection kits repeat steps 3 to 16 to prepare the remaining trace
heaters, introduce them into the junction box and tighten the gland
Feed the cold lead cable into the junction box
↻
6 ft lbs
16
18
19
17
Power connection
Installation Instruction
© Danfoss | 2017 11 | 11
VILWC122
Power connection kit - Cable to Junction Box with ½” NPT cable gland