Inside the junction box, use the individual terminal blocks to connect the bus wires and the
twisted grounding braid / grounding conductor to each other Make sure that the wires are fully
engaged in the terminal block
Phases
Neutral
Ground
Establish all connections as shown in the following figure
Mount the cover of the junction box according to the manufacturer’s installation instructions
20
21
22
Power connection
Installation Instruction
12 | © Danfoss | 2017 11
VILWC122
Power connection kit - Cable to Junction Box with ½” NPT cable gland