Installing the Top-entry Sub D9 Connector Kit
This kit includes parts for extending PROFIBUS module cabling
through the top of the drive enclosure. Use the following
steps to install the sub D9 connector in the top of the
enclosure. Alternatively, a strain relief is included in the kit and
can be used for shield termination in non-IP54 installations.
For optional strain relief installation, refer to
Illustration 1.7
.
1.
Remove the front cover from the drive.
2.
Remove the local control panel (LCP).
3.
Remove the LCP cradle by pulling the cradle
outward. See
Illustration 1.1
.
4.
Unfasten 2 M5 nuts (8 mm) from the underside of
the left cover plate, and remove the plate from the
drive enclosure. Retain the 2 M5 nuts.
1
Drive enclosure
3
LCP cradle
2
Left cover plate
4
LCP
Illustration 1.1 Removal of LCP, LCP Cradle, and Left Cover Plate
Installation Instructions
Top-entry Sub D9 Connector Kit for
Enclosure Sizes D and E with PROFIBUS Option
VLT
®
FC Series FC 102, FC 103, FC 202, and FC 302
2
Danfoss A/S © 10/2017 All rights reserved.
MI38Q302