background image

1.5.6 Installing Gaskets to the Back of a

D7h/D8h Enclosures

NOTICE

APPLYING GASKETS

This kit contains gaskets to ensure a proper seal between
metal parts. Before adhering a gasket to a part, check that
the part matches the gasket and that no holes are covered.
Remove paper backing and place the sticky side on the part.

1.

Install 1 of the vent gaskets (2) around the exhaust
vent opening on the back of the enclosure.

2.

On top of the gasket, install the exhaust spacer (1) to
the back of the enclosure panel using 8 M5x18
screws. Torque to 5.1 Nm (45 in-lb).

3.

Install 1 of the vent gaskets (2) to the exhaust spacer.

4.

Apply the 2 labels (3) over the back-channel form
holes.

5.

Install 1 of the vent gaskets (5) around the intake
vent opening on the back of the enclosure.

6.

On top of the gasket, install the intake spacer (4) to
the back of the enclosure panel using 8 M5x18
screws. Torque to 5.1 Nm (45 in-lb).

7.

Install 1 of the vent gaskets (5) to the intake spacer.

8.

Install the slot gasket (6) to cover the mounting holes
used to secure the enclosure to the base plate.

1

Exhaust spacer

2

Exhaust  vent  gaskets

3

Slot  gasket

4

Intake  spacer

5

Intake  vent  gaskets

6

Slot  gasket

Illustration 1.13 Installing Sealing Gaskets to Back Panel for the

D7h/D8h Frequency Converters

Installation Instructions

In-back/Out-back Cooling Kit for D5h/D6h and D7h/D8h Enclosures VLT® Series FC 102, FC 202,
and FC 302

8

Danfoss A/S © 10/2016 All rights reserved.

MI70F102

Summary of Contents for 176F3530

Page 1: ...18 D7h D8h 2 Top plate 1 3 Gasket between top plate and frequency converter 1 Illustration 1 1 Top Plate Components Base plate assembly 1 Bottom bracket 1 2 Gasket between base plate and frequency co...

Page 2: ...n remain charged even when the unit is off High voltage can be present even when the warning indicator lights are off Failure to wait 20 minutes after power has been removed before performing service...

Page 3: ...tor 4b Mains 4c Brake if so equipped 1 Motor busbar 2 Mains busbar 3 Brake busbar optional 4 Ground plate Illustration 1 6 Jumper Busbars Between the Frequency Converter and the Enclosure The ground p...

Page 4: ...nnector plates 1 M10 eyebolt on top of frequency converter 2 Top connector plate 3 Screw M5x12 on connector plate Illustration 1 9 Removing the Top Connection Plates 7 Unfasten the base of the frequen...

Page 5: ...n 1 11 8 Install the bottom cover 7 onto the bottom gasket Refer to step 4 in Illustration 1 11 Secure with M5x12 screws 4 D5h D6h or 6 D7h D8h Torque to 5 1 Nm 45 in lb 9 Install 1 M5x12 screw into t...

Page 6: ...lling the Frequency Converter into the Enclosure Installation Instructions In back Out back Cooling Kit for D5h D6h and D7h D8h Enclosures VLT Series FC 102 FC 202 and FC 302 6 Danfoss A S 10 2016 All...

Page 7: ...k of the enclosure panel using 6 M5x18 screws Torque to 5 1 Nm 45 in lb 8 Install 1 of the vent gaskets 7 to the intake spacer 9 Install the slot gasket 4 to cover the mounting holes used to secure th...

Page 8: ...the 2 labels 3 over the back channel form holes 5 Install 1 of the vent gaskets 5 around the intake vent opening on the back of the enclosure 6 On top of the gasket install the intake spacer 4 to the...

Page 9: ...he intake bottom vent openings and insert the 4 M5 X 12 pem studs 3 For the D7h D8h enclosures perform the following steps 3a Drill 4 mounting holes near the top of the mounting backplate 3b Drill the...

Page 10: ...ucts already on order provided that such alterations can be made without subsequential changes being necessary in specifications already agreed All trademarks in this material are property of the resp...

Reviews: