Installation Instructions
Tall Pedestal Installation Overview
E1h and E2h drives are intended for floor installation only. A pedestal and gland plate must be installed for proper operation of the
drive. The tall pedestal kit replaces the standard pedestal that ships with the drive. Remove the standard pedestal and properly
dispose of it before installing the tall pedestal.
The tall pedestal is 400 mm (15.7 in), and features a front grill to allow the airflow necessary to cool the drive components. The
gland plate ships with the drive and is necessary to maintain the IP21/Type 1 or IP54/Type 12 protection rating.
1
Locking bracket
6
M5x14 countersunk screws
2
M10 nylon-insert lock nut
7
Front panel
3
M10x22 screws
8
Pedestal
4
M8 nut
9
Pedestal cutout
5
Front top bracket
10
Front bottom bracket
Illustration 1.1 Tall Pedestal Kit Overview
Installation Instructions
Tall Pedestal Kit for E1h/E2h Drives
VLT
®
FC Series FC 102, FC 103, FC 202, and FC 302
2
Danfoss A/S © 03/2018 All rights reserved.
MI35V102