EN
4
Assembly process
Cable construction design
Heating cable
1
2
3
4
5
6
Layer
Name
Designation
1
Bus wire
Tinned copper
2
Matrix
XLPE with carbon black
3
Insulation jacket
TPO flame retardant
4
Shield
Aluminium polyester
tape – thin drain wire
5
1
st
Jacket
MDPE
6
Outer sheath
PVDF
Cold lead
Layer
Name
1
Bus wire
2
Wire insulation
3
Inner sheath
4
Outer sheath
Before you start the assembly process you must check the power supply line with the multimeter to
ensure they are de-energized and ensure the control unit is installed according to the installation
instruction provided and check the ground fault protection.
This appliance can be used by children aged from 8 years and above and persons with reduced
physical, sensory, or mental capabilities or lack of experience and knowledge if they have been
supervision or instruction concerning use of the appliance in a safe way and understand the hazards
involved. Children shall not play with the appliance. Cleaning and user maintenance shall not be
made by children without supervision.
Installation Guide Connection kit - cable to cold lead + end termination (Pipeheat)
DEVI
8