Electric Machine Installation Checklist
Date:
Table 11. Machine and customer information
Customer:
Machine type (from the rating plate):
Customer reference:
Machine serial number:
Service reference:
Date installed:
N.A = Procedure not applicable PASS = Procedure passed FAIL = Procedure failed
Table 12. Installation checklist
Approval
N.A
PASS
FAIL
General
Machine type is correct
☐
☐
☐
Machine is undamaged
☐
☐
☐
Insulation resistance check
>150MΩ
☐
☐
☐
Environmental conditions as speci ed (see data sheet)
☐
☐
☐
Mechanical installation
Supporting structure as required
☐
☐
☐
Shaft alignment as speci ed (see chapter Shaft alignment and load).
☐
☐
☐
D-end attachment bolt tightening torque
40 Nm
☐
☐
☐
N-end attachment bolt tightening torque
30 Nm
☐
☐
☐
Cooling circuit connected and coolant owing
☐
☐
☐
Used coolant:
Power connections
Cable gland assembly as speci ed (cable gland to cables) with correct cable diameter
☐
☐
☐
Cable lug air cap (to metallic structures)
≥10 mm
☐
☐
☐
Cable gland tightening torque (to the box)
15 Nm
☐
☐
☐
Cable lug tightening torque (to the busbar)
13 Nm
☐
☐
☐
The phase connections order is correct (U, V, W -> L1, L2, L3)
☐
☐
☐
Connection box cover bolts tightening torque
4 Nm
☐
☐
☐
EM-PMI540-T1500
13. Storage, installation and maintenance checklists
60 |
©
Danfoss | Produced By: Danfoss Power Solutions | January 2019
| BC265856800806en-000106
Summary of Contents for EM-PMI540-1500
Page 1: ...User Guide Motor Generator EM PMI540 1500 danfoss com...
Page 69: ......