16
MG.10.G1.51 – VLT is a registered Danfoss trademark
Gateway InterBus-S
T
echnical data
Display messages
Ub
Ub
Ub
Ub
Ub
all voltages are ok
BA
BA
BA
BA
BA
InterBus-S active, Master is connected
and active
CC
CC
CC
CC
CC
InterBus-S is ok, data exchange is
occurring
TR
TR
TR
TR
TR
PCP transmission is in progress
DP ok
DP ok
DP ok
DP ok
DP ok
PROFIBUS-DP is ok, all participants
selected on the rotary switch communi-
cate
DP TXO
DP TXO
DP TXO
DP TXO
DP TXO
the gateway is transmitting via the
PROFIBUS-DP
Terminals and plugs
3 terminals:
3 terminals:
3 terminals:
3 terminals:
3 terminals:
Voltage supply 24 V-DC (+ ; -);
Earth
1 SUB-D-
1 SUB-D-
1 SUB-D-
1 SUB-D-
1 SUB-D-female plug
female plug
female plug
female plug
female plug 9 pol.:
9 pol.:
9 pol.:
9 pol.:
9 pol.:
PROFIBUS-DP-connection
1 SUB-D-male plug 9 pol.:
1 SUB-D-male plug 9 pol.:
1 SUB-D-male plug 9 pol.:
1 SUB-D-male plug 9 pol.:
1 SUB-D-male plug 9 pol.:
InterBus-S IN
1 SUB-D-female plug 9 pol.:
1 SUB-D-female plug 9 pol.:
1 SUB-D-female plug 9 pol.:
1 SUB-D-female plug 9 pol.:
1 SUB-D-female plug 9 pol.:
InterBus-S-OUT
■
■
■
■
Operating elements
Number of DP-Slaves
Number of DP-Slaves
Number of DP-Slaves
Number of DP-Slaves
Number of DP-Slaves
Hex-rotary switch for the number of
connected VLTs, setting > 14 leads to a
flashing LED "DP ok"
PPO1 / PPO3
PPO1 / PPO3
PPO1 / PPO3
PPO1 / PPO3
PPO1 / PPO3
Slide switches for the selection of PPO
Type1 or PPO Type3, all VLT
®
3000 must
be set to the same PPO Type.
The positions of these two switches are
adopted at Power-Up. If these are
displaced during operation, the LED
"DP ok" flashes
Housing
Enclosure IP20
Terminal rail housing LDG-A30
Dimensions: 112x100x75 (HxLxW)