Chapter 10.0 Control Logic Guidelines for Multiple Compressors
Due to the nature of centrifugal compression, special control logic must be implemented for proper staging of
multiple Danfoss LLC compressors when installed on a common circuit. This section is intended only as a guide
without going into details. Control details are specific to each OEM’s individual control strategy. The Danfoss LLC
centrifugal compressors can be controlled by staging compressors and running the on line compressors in parallel.
Staging valve:
The Staging valve is piped in upstream of the check valve to provide a low pressure bypass path and
is used to reduce the pressure ratio in the system to assist in startup and shutdown of a compressor. Staging valves
are mandatory for all Danfoss LLC compressors.
Load balancing valve (hot gas bypass):
The Load Balance Valve (LBV) is piped downstream of the check valve and
is primarily used in low load conditions to keep the compressor operational instead of cycling off. It is possible to
use a staging valve as a LBV but sizing and control can be a little more challenging and for that reason they are both
frequently installed in many systems.
For additional details related to starting, stopping, staging, for all aspects of single and multiple compressor control,
please consult the OEM Programming Manual.
NOTE
The hot gas evacuated by the staging valve must be injected downstream of the main EXV in order to desuperheat the gas prior to
entering the suction of the compressor.
• • • CAUTION • • •
If the staging valve is used as a LBV, there are two major risks:
l
Check valve chattering if the bypassed flow is too high, this chattering will lead to bearing faults due to vibrations (Please
contact Danfoss LLC for further information)
l
High suction superheat which may lead to compressor fault
Staging valve sizing method:
Using CPR, rate a compressor at the maximum pressure ratio for which the chiller is
designed to operate. Use the maximum Evaporator Mass Flow Rate to select an appropriately sized staging valve.
Load Balancing Valve Sizing:
Using CPR, rate the compressor at the minimum load and conditions at which the
compressor is expected to operate. Use the Evaporator Mass Flow Rate to determine the required mass flow which
must be bypassed through the load balance valve to reach the desired minimum load.
NOTE
Danfoss LLC highly recommends the use of a solenoid valve as a staging valve as it is faster to provide pressure relief to the compressor in
case of emergency shutdown. We recommend to command the Solenoid valve with the "compressor status" contact on the I/O board.
Staging valve (solenoid type) can be selected from Danfoss portfolio e.g., EVR32 for TTS300 & TTS350 and EVR40 for TTS400 & TTS700
compressors. These valves should provide satisfactory starting and shutdown functionality, however Danfoss LLC Applications strongly
recommends testing with supervision of an Application Engineer to ensure proper operation during all start and stop conditions.
M-AP-001-EN Rev. S-9/8/2021 Page 69 of 136
Summary of Contents for TGH285
Page 2: ...THIS PAGE INTENTIONALLY LEFT BLANK Page 2 of 136 M AP 001 EN Rev S 9 8 2021 ...
Page 8: ...Page 8 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 10: ...Page 10 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 20: ...Figure 2 2 Compressor Nomenclature Page 20 of 136 M AP 001 EN Rev S 9 8 2021 ...
Page 24: ...Page 24 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 40: ...Page 40 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 44: ...Page 44 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 52: ...Page 52 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 54: ...Page 54 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 66: ...Page 66 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 68: ...Page 68 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 70: ...Page 70 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 72: ...Page 72 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 74: ...Page 74 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 80: ...Page 80 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 94: ...Page 94 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 110: ...Page 110 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 112: ...Page 112 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 114: ...Page 114 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 126: ...Page 126 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 128: ...Figure B 2 Grounding Diagram Page 128 of 136 M AP 001 EN Rev S 9 8 2021 ...
Page 132: ...Page 132 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 134: ...Page 134 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK ...