Figure 20-3 Incorrect Compressor Mounting Pad Installation
Figure 20-4 Correct Compressor Mounting Pad Installation
In the event the mounting base is not used and the compressor is secured directly to the chiller, refer to the fastener
specifications in Table 20-1 Mounting Base Screw Hole Specifications.
Table 20-1 Mounting Base Screw Hole Specifications
Fastener Thread Spec
Thread Depth (mm)
Recommended Torque (Nm)
M12
24
22
20.5 Piping Connections
• • • CAUTION • • •
Install new O-rings when attaching flanges to the compressor. The OEM must make sure all sealing materials and equipment on the unit
are compatible with the appropriate refrigerant.
• • • DANGER • • •
The motor-cooling line should be channeled from the liquid line ( Figure 20-5 Motor-Cooling Connection and Access Port
The motor-cooling line requires the installation of a service valve (not included) to enable refrigerant isolation during compressor
servicing.
Compressors are pressurized with nitrogen to (15 psi). Pressure should be relieved through the Schrader valve, located next to the motor
cooling connection, prior to removing the blanking plates. Isolation and recovery of the refrigerant must be performed by a qualified
technician. Always wear proper safety equipment when handling refrigerants ( Figure 20-5 Motor-Cooling Connection and Access Port).
M-AP-001-EN Rev. S-9/8/2021 Page 117 of 136
Summary of Contents for TGH285
Page 2: ...THIS PAGE INTENTIONALLY LEFT BLANK Page 2 of 136 M AP 001 EN Rev S 9 8 2021 ...
Page 8: ...Page 8 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 10: ...Page 10 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 20: ...Figure 2 2 Compressor Nomenclature Page 20 of 136 M AP 001 EN Rev S 9 8 2021 ...
Page 24: ...Page 24 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 40: ...Page 40 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 44: ...Page 44 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 52: ...Page 52 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 54: ...Page 54 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 66: ...Page 66 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 68: ...Page 68 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 70: ...Page 70 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 72: ...Page 72 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 74: ...Page 74 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 80: ...Page 80 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 94: ...Page 94 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 110: ...Page 110 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 112: ...Page 112 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 114: ...Page 114 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 126: ...Page 126 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 128: ...Figure B 2 Grounding Diagram Page 128 of 136 M AP 001 EN Rev S 9 8 2021 ...
Page 132: ...Page 132 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 134: ...Page 134 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK ...