5. Slide both pipes over the stubs of the valve ensuring a minimum of a 9.5 mm (3/8”) connecting joint.
6. Wrap the valve in cool wet towels to help prevent excessive heat from damaging the valve.
7. Heat the two (2) sections of pipe and apply a (6% silver 94% tin) type solder ensuring the two (2) pipe
connections are properly sealed.
• • • CAUTION • • •
Ensure the body of the valve gets no hotter than 285°F (140°C).
• • • CAUTION • • •
To prevent damaging the internal components of the valve, do not point the flame towards the center (body) portion of the valve. Refer to
Figure C-4 Brazing Connections.
Figure C-4 Brazing Connections
8. Once cooled, Re-install the Schrader valve. Finger tight plus a ½ turn (3Nm). Then install the Schrader valve cap.
9. Leak test the cooled joint to ensure there are no leaks.
10. Use an appropriately sized hex wrench to turn the setting screw. Set the valve according to Table C-1
Table C-1 KVP Setting
Setting KVP for 30°F
Refrigerant
Pressure @ 30°F
360° Rotations for 30°F
R134a
26
4.3
R513A
30
5.0
R1234ze
15
2.5
R515B
30
5.0
Page 130 of 136 - M-AP-001-EN Rev. S 9/8/2021
Summary of Contents for TGH285
Page 2: ...THIS PAGE INTENTIONALLY LEFT BLANK Page 2 of 136 M AP 001 EN Rev S 9 8 2021 ...
Page 8: ...Page 8 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 10: ...Page 10 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 20: ...Figure 2 2 Compressor Nomenclature Page 20 of 136 M AP 001 EN Rev S 9 8 2021 ...
Page 24: ...Page 24 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 40: ...Page 40 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 44: ...Page 44 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 52: ...Page 52 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 54: ...Page 54 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 66: ...Page 66 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 68: ...Page 68 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 70: ...Page 70 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 72: ...Page 72 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 74: ...Page 74 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 80: ...Page 80 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 94: ...Page 94 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 110: ...Page 110 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 112: ...Page 112 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 114: ...Page 114 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 126: ...Page 126 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 128: ...Figure B 2 Grounding Diagram Page 128 of 136 M AP 001 EN Rev S 9 8 2021 ...
Page 132: ...Page 132 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 134: ...Page 134 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK ...