Figure 4-2 Modbus Grounding Diagram
Table 4-1 Control Wiring Details
I/O
Description
COM (shield)
Shield for RS-485 communication.
Modbus RS-485
NetB/NetA
Modbus over RS-485 communication port.
Stepper Motor 1 Phase
1A, 1B, 2A, 2B, and
Stepper Motor 2 Phase
1A, 1B, 2A, 2B
Optional output connections for controlling the main electronic expansion valve (evaporator) or auxiliary
electronic expansion valve (economizer or load balancing valve). 200ma Maximum output on each driver.
Valve frequency will effect operational characteristics.
Level 15V
(Evaporator)
Power supply for level sensor #1.
Sensor Signal
(Evaporator)
Input from a level sensor to control the main expansion valve (evaporator).
Level 15V
(Economizer)
Power supply for level sensor #2.
Sensor Signal
(Economizer)
Input from a level sensor to control the auxiliary expansion valve (economizer).
Demand 0 - 10V
Analog input from customer-supplied controller to drive the compressor, i.e., 0 - max. kW input with a
deadband of 2VDC for the respective compressor model. Only available in 3.1.4; removed in 4.x forward.
Interlock
Connects to a set of external normally closed contacts that typically open in the event of loss of chilled
water or air flow. Typically a 1.5VDC Output signal. NOTE: This is not a safety certified interlock.
Status
An internal normally open contact that is closed during normal operation and opens in the event of a
compressor fault. With the circuit open, the compressor will not restart until the demand signal has been
reset to 0 (via chiller/unit controller). Circuit rated at 1A @ 30VDC/24VAC or .03A @ 120VAC.
Liquid Temperature
Optional input for monitoring temperature. The temperature sensor must be an NTC type 10K @ 25°C
Page 36 of 136 - M-AP-001-EN Rev. S 9/8/2021
Summary of Contents for TGH285
Page 2: ...THIS PAGE INTENTIONALLY LEFT BLANK Page 2 of 136 M AP 001 EN Rev S 9 8 2021 ...
Page 8: ...Page 8 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 10: ...Page 10 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 20: ...Figure 2 2 Compressor Nomenclature Page 20 of 136 M AP 001 EN Rev S 9 8 2021 ...
Page 24: ...Page 24 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 40: ...Page 40 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 44: ...Page 44 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 52: ...Page 52 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 54: ...Page 54 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 66: ...Page 66 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 68: ...Page 68 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 70: ...Page 70 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 72: ...Page 72 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 74: ...Page 74 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 80: ...Page 80 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 94: ...Page 94 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 110: ...Page 110 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 112: ...Page 112 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 114: ...Page 114 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 126: ...Page 126 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 128: ...Figure B 2 Grounding Diagram Page 128 of 136 M AP 001 EN Rev S 9 8 2021 ...
Page 132: ...Page 132 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 134: ...Page 134 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK ...