Procedure
1. Open the cover of the AC drive.
e
3
0
b
g
0
8
3
.1
0
2. Remove the screws of the cable cover. Remove the cable cover. Do not open the cover of the power unit.
e
3
0
b
g
0
8
4
.1
0
3. Locate the terminals.
Electrical Installation
Operating Guide | VACON® NXS/NXP Air-cooled
AQ275638903263en-000301 / DPD00910
52 | Danfoss A/S © 2020.02