2. Send Reset signal (via Bus, Digital I/O or

[Reset] key). The test step is passed if the motor

remains in the Safe Stop state and the

mechanical brake (if connected) remains

activated.

3. Reapply dual pole voltage supply to MCB

108 inputs. The test step is passed if the motor

remains in the coasted state and the

mechanical brake (if connected) remains

activated.

4. Send Reset signal (via Bus, Digital I/O or

[Reset] key). The test step is passed if the motor

gets operational again.

5. The commissioning test is passed if all four test

steps are passed.

Commissioning T

Commissioning T

Commissioning T

Commissioning T

Commissioning Test

est

est

est

est

After installation and before first operation, perform a

commissioning test of an installation or application making

use of FC 302 Safe Stop with MCB 108.

Moreover, perform the test after each modification of the

installation or application, which the FC 302 Safe Stop is

part of.

A passed commissioning test is a necessary condition for

fulfillment of EN 954-1 Cat. 3

 ISO13849-1 P Ld 

 of an

application with FC 302 Safe Stop and MCB 108.

The commissioning test:

1. Remove the dual pole voltage supply to MCB 108

inputs by the safety device while the motor is

driven by the FC 302 (i.e. mains supply is not

interrupted). The test step is passed if the motor

reacts with a coast and the mechanical brake (if

connected) is activated.

130R0362

Rev. 2009-07-08

Safety PLC Connection

Safety PLC Connection

Safety PLC Connection

Safety PLC Connection

Safety PLC Connection

Do not combine liveparts and PELV

Do not combine liveparts and PELV

Do not combine liveparts and PELV

Do not combine liveparts and PELV

Do not combine liveparts and PELV

systems.

systems.

systems.

systems.

systems.

Wires between X31/9 and Terminal 37 have

Wires between X31/9 and Terminal 37 have

Wires between X31/9 and Terminal 37 have

Wires between X31/9 and Terminal 37 have

Wires between X31/9 and Terminal 37 have

to be short-circuit protected if not inside

to be short-circuit protected if not inside

to be short-circuit protected if not inside

to be short-circuit protected if not inside

to be short-circuit protected if not inside

the cabinet.

the cabinet.

the cabinet.

the cabinet.

the cabinet.

Wire inserting in MCB 108

Wire inserting in MCB 108

Wire inserting in MCB 108

Wire inserting in MCB 108

Wire inserting in MCB 108

Correct wire inserting

Reviews: