background image

3000

40m

20m

10m

5m

2.5m

80s

40s

20s
10s

100

up to 5m

For optimum 

coverage

recommended 

mounting

height: 2.4 

to 5m

up to 10m

BMPIR5M

BMPIR10M

100°

112°

For optimum 

coverage

recommended 

mounting

height: 2.4 

to 5m

up to 1.5m

For optimum 

coverage

recommended 

mounting

height: 2.4 

to 5m

BMPIRSP

20°

For optimum 

coverage

recommended 

mounting

height: 2.4

BMPIRRH

100°

Installation procedure

1. Please read these notes carefully before commencing work.

 

In case of doubt please consult a qualified electrician.

 

Make sure the power is isolated from the circuit.

2. Remove the 20mm knockout from the end of the lighting batten.
3. Making reference to diagram A: Remove the 20mm thread from the 

PIR and insert it through the 20mm knockout hole with the thread 

facing outwards

4. Feed the trailing wires through the thread and with the PIR facing 

downwards tighten the 20mm thread.

5. The trailing wires should be connected to the ballast as: 

Brown - Live supply.  Blue - Neutral  supply. White - Switched Line to ballast.

6. Once the wiring has been completed and verified, switch on the supply 

and test the operation.

 

Set-up

7.  When powered up, (after 1 minute stabilisation time) turn lux pot 

fully clockwise and time pot fully anticlockwise.

8.  Press the button for approximately 0.5s. The LED will go green indi

-

cating the LUX cell is active. (Or press and hold button for approx. 4 

seconds – LED goes RED indicating Lux cell INACTIVE). Repeating 

these steps will toggle the functionality.

9.  If lux cell active, vacate area until PIR switch switches the load off 

(should be after 10 seconds).

10. With the LUX as desired on desktop from daylight ONLY (no artificial 

light), wind the lux pot anticlockwise whilst waving your hand in front 

of the PIR cell. When the PIR switches the load ON, stop turning the 

pot. The Lux inhibit level is now set.

11.  Turn the PIR time to the desired timeout.

To light

fitting

ballast

C: Lux   

adjustment

D: Time 

adjustment

Dual colour LED

RED - PIR active, Photocell inactive

GREEN - PIR and Photocell override ON (passive LUX)

Lux Cell

Mode

PIR Lens

Time 

delay 

setting

Lux setting

Lux cell

PIR head - key components

Precondition

Power-up Condition

Lux Cell Inactive

Relay OFF

Lux Cell Inactive

Relay comes ON for 1 Min. After 1 min. ready for detection.

Lux Cell Active

Relay ON

Lux Cell Active

Relay stays ON for 1 Min. After 1 min. ready for detection.

Lux Cell Active

Relay OFF

Lux Cell Active

Relay comes ON for 1 Min. After 1 min. ready for detection.

Lux Cell Inactive

Relay ON

Lux Cell Inactive

Relay stays ON for 1 Min. After 1  min. ready for detection.

A: Installation diagram, 

viewed from below

B: Detection range

3000

40m

20m

10m

5m

2.5m

80s

40s

20s
10s

100

Reviews: