background image

Installation procedure

1. Please read these notes carefully before commencing work. In case of doubt 

please consult a qualified electrician. Ensure wires and cables are securely held 

within the connection terminals.

  IMPORTANT: The EZ CEFL Control Unit clock battery must be engaged (ON) 

prior to installation by switching the RED dip switch (see diagram E) to the 

DOWN position.

2. POSITIONING: The EZ CEFL switch should be installed to achieve correct 

coverage of the area, see diagram B. If the photocell override facility (enabled 

via EasyZAPP app) is required, the switch must be located above an area where 

daylight can give greater illumination than the artificial light. Avoid locating this 

product where it is exposed to drafty conditions (exposed lobbies, open ceiling 

voids or near fans) or near heat sources. To cover large areas PIRs should be 

spaced in a 5 metre grid formation.

3. Disconnect the PIR from the circuit before performing insulation testing of the 

wiring circuit. 

4. Do not connect on a circuit with large inductive loads, as induced spikes may 

cause false triggering or damage the PIR.

5. EZ CEFL must be connected to the EasyZAPP Power Supply (CZPS) via the 

EasyZAPP communication cable provided, for wiring see diagrams C and D.  

NOTE: The use of non EasyZAPP connectors may damage the  

EZ CEFL or CZPS and will invalidate the warranty.

Settings and calibration

ALL settings are adjusted by EasyZAPP App as detailed in the free to download 

EasyZAPP App User Guide, including: 

Timeout:

 Adjustable time lag from 10 seconds to 24 hours.

Brightness:

 Adjustable switching threshold, 30 to 1000 lux and inactive. 

EZ CEFL must be calibrated as instructed on the user guide manual.

Batch Configure: 

For configuring multiple EZ CEFL controls with identical settings.

Name: 

For identifying individual controls.

Password: 

For security against accidental or malicious alteration.

Please visit www.danlers.co.uk to download the EasyZAPP user guide.

B: Detection diagram

up to 5m
up to 7m

Strong detection zone 

i.e. person moving arm

or walking towards PIR

Secondary detection 

zone i.e. person 

walking perpendicular 

to PIR 

For optimum coverage 

recommended 

mounting height: 2.4 to 5m

SL  

L
L  

N

Telejack connector

Control Unit

Power Supply

Red dip switch (MUST be 

switched DOWN (towards lens) 

to engage clock battery ON)

IMPORTANT

E: Connector diagram

A: Mounting diagram

 

CEILING VOID 

(At least 78mm deep) 

75mm circular hole 

cut for PIR switch

L

load

N

100 - 260 VAC

50 / 60 Hz

L

N

SL

L

load

N

100-260 VAC

50 / 60 Hz

L

N

SL

L

N

SL

L

N

SL

Several EZ CEFL wired in parallel

Single EZ CEFL

L

load

N

100 - 260 VAC

50 / 60 Hz

L

N

SL

L

load

N

100-260 VAC

50 / 60 Hz

L

N

SL

L

N

SL

L

N

SL

Several EZ CEFL wired in parallel

Single EZ CEFL

C: Wiring diagram

D: Wiring diagram

Reviews: