DANGER
Fig: 14
Fig: 15
FOR TECHNICAL QUESTIONS, CALL (877)432-6627
21
NOTE:
Make sure to tighten both nuts equally so as to
keep the safety cable centered.
ENSURE THAT BOTH THE POWERSIDE & OFFSIDE
SAFETIES ENGAGE PROPERLY PRIOR TO LIFT OPERA-
TION.
STEP 10
(Installing Hydraulic Lines)
1.
Install the bulkhead tee fitting into the powerside
column. The through hole is located approximately 90
inches from the floor on the back wall of the powerside
column.
2.
Connect the powerside cylinder hose to the tee
fitting, be sure to route the hose through the retainer
rings inside the columns.
3. Route the offside cylinder hose (crossover hose) up through the column and across the top trough,
down the column and connect it to the bulkhead tee fitting. (See figure 16)
When routing the hydraulic hose through the columns, make sure to route through the retaining rings
Fig: 12
Fig: 13
WARNING
NOTE: Pulley
plate removed
for clarity.
NOTE: Pulley
plate removed
for clarity.
Summary of Contents for D-10 Series
Page 1: ...A ND VALIDATE D Rev D 06202018 P N 199824...
Page 46: ......
Page 47: ...D10ACX...
Page 52: ...Dannmar R EQUIPMENT...