1. After electrical power is connected and oil reservoir is
full, press button to raise lift.
2. Continue raising until lift cylinders bottom out at full
height. Do not continue pressing the button after the
lift reaches full height. Damage to the motor can oc-
cur if continued.
3. Lower the lift only half way by pressing the safety
release handle inward then pressing in the down lever
on the power unit.
4. With the lift at half height, slowly loosen the bleed screws located at the top of each cylinder to bleed
trapped air. Do not completely remove bleed screws. One full turn should purge any trapped air. Re-
tighten after trapped air has escaped. (See figure 33)
5. Lower the lift completely by pressing the safety release handle inward then pressing the down lever on
power unit. Wait five minutes and repeat bleeding process one additional time.
Columns are properly shimmed and stable
Anchor bolts are tightened
Pivot / sheave pins are properly attached
Carriage stop bolts torqued to 2-3 ft. lb
Electric power supply confirmed
Cables are adjusted properly
Safety locks are functioning properly
Check for hydraulic leaks
Oil level
Lubcation of critical components
Check for overhead obstructions
Lift arms are level
All screws, bolts, and pins are secured
Surrounng area is clean
Operation, maintenance and safety manuals on
site.
B
A
C
D
After installation and start up has been completed, lubricate the lift components described below on
both columns with a white lithium grease. (See figure 32)