GENERAL
INFORMATION
SECONDARY CHANNELLING
It is possible to send, via secondary ducting, part of the volume of treated air to other rooms (e.g.
an office) through the pre-cut hole.
TYPE
1
2
3
pre-cut hole
mm
150
150
300
1.
Pre-cut hole
2.
Circular fitting with stop (not supplied)
3.
Secondary channelling (not supplied)
INSTALLATION
INFORMATION
FUEL CONNECTION
The machine should be connected to the fuel network by qualified and skilled personnel and the
manual instructions and the relevant regulations should be carefully complied with.
P
age
.
17