background image

 

 

INSTALLATION 

INFORMATION 

SMOKE DISCHARGE 

 
Fume exhaust connection position and example of connection to the flue: 

 

 

 

1. 

Condensate discharge fitting

, necessary to prevent any condensate that has formed 

in the flue to flow inside the heat exchanger. 

 
 

 

  The  exhaust  pipe  and  the  flue  connector  should  be  made  in  compliance  with  the  Regulations 

and  Laws  in  force.  They  should  be  made  up  of  metal  and  stiff  ducts,  capable  of  resisting  to 
mechanical, thermal and chemical stress caused by the combustion. 

  It is mandatory that all components of the flue be certified 

 

  To  avoid  reflux  of  condensation  from  the  flue  to  the  hot  air  generator,  there  must  be  a 

condensation discharge at the lowest point of the smoke duct. 

  The weight of the entire smoke duct must not rest on the appliance. 

  The  flue  must  ensure  the  minimum  depression  required  by  the  current  technical  standards, 

considering "zero" pressure to the connection with the fume duct. 

  Non insulated exhaust pipes might be a source of dangers. 

  Unsuitable  or  wrongly  sized  flues  or flue gas  pipes  might  amplify  the  burning  noise  and  affect 

negatively the combustion parameters. 

  Joint seals should be made of materials resistant to the thermal and chemical stress caused by 

the combustion products. 

  If  walls  and/or  covers  have  to  be  crossed,  this  operation  should  be  perfectly  carried  out, 

preventing seepage or fire risks. 

 

 

 

The use of pipes made of plastic material is forbidden 

 

IF INSTALLATION IS PROVIDED IN THE  AREA OF FREE  ACCESS  TO  PERSONS  AND / OR 
ANIMALS,  THE  FLUE  PIPE  UP  TO  APROX.  2  METERS  ABOVE,  MUST  BE  REALIZED  IN 
DOUBLE  WALL  VERSION  AND/OR  EQUIPPED  WITH  ANTI-SCALD  PERFORATED 
NETWORK. 

P

age

.

18

 

Summary of Contents for Master BF 105

Page 1: ...P 1 INSTALLATION AND OPERATION SERIES BF INSTALLATION AND OPERATION...

Page 2: ...RAL INFORMATION COMPLIANCE The hot air generator mod BF complies with Machinery directive 2006 42 EC Low Voltage Directive 2006 95 EC Electromagnetic Compatibility Directive 2004 108 EC Regulation 201...

Page 3: ...g 17 Fuel connection 17 Fume exhaust 18 Combustion air 19 Assembly of diesel burner 19 Burner control 20 Wiring 20 Electrical power supply 21 Wiring diagram reference 21 Control panel 22 Fuel tank 22...

Page 4: ...shall be fitted only with original accessory equipment The Producer is not liable for damages arising from the improper use of the machine or from the use of non original materials or accessories Ref...

Page 5: ...within the reach of children the packaging materials cardboard staples plastic bags etc as they may be potentially dangerous Do not install the unit near flammable material or in rooms with an aggres...

Page 6: ...decreasing section and with opposing turbulencing prints Steel flue gas manifold equipped with an inspection door External casing The casing consists of panels in pre painted and or powder coated shee...

Page 7: ...eration GENERAL INFORMATION IDENTIFICATION The warm air heaters can be identified through The Technical Plate applied on the machine specifying the main technical performance data In the event of dama...

Page 8: ...nt 3 Diesel filter where present 4 Filler neck where present 5 Diesel burner 6 Electrical panel 7 Fan 8 Fan support 9 Diaphragm 10 Deflector 11 Deflector 12 Deflector 13 Panel 14 Side panel 15 Beam 16...

Page 9: ...rform an inversion in the combustion chamber are routed to the first exhaust manifold front manifold and are channelled in the exchange elements smoke pipes arrive in the second exhaust manifold rear...

Page 10: ...e 10 GENERAL INFORMATION DIMENSIONS AND WEIGHT TYPE A B C D NET WEIGHT1 mm mm mm mm mm kg 1 1 020 500 1 600 1 240 120 140 2 1 120 540 1 700 1 320 150 180 3 1 400 760 2 000 1 580 180 315 1 Without burn...

Page 11: ...800 5 300 8 800 Nominal air thermal gradient K 29 32 31 FAN thermostat calibration C 35 35 35 LIMIT thermostat calibration C 100 100 100 Sound pressure emission 4 dB A 57 60 70 Range of use C 5 40 5...

Page 12: ...ow 90 6 89 7 89 9 s h 72 3 72 1 72 9 Legend P rated h Nominal heating capacity P rated h Minimum heating capacity nom Nominal heating capacity useful efficiency pl Minimum capacity useful efficiency e...

Page 13: ...to the width of the machine If belts or ropes are used a rocker arm must be used not included to prevent the pressure exerted by the same from damaging the structure of the unit Should it be necessar...

Page 14: ...g and maintenance operations maintain the safety distances from flammable material be placed close to a flue chimney be able to be connected to the fuel source be close to an electrical socket allow f...

Page 15: ...ter wall with delivery on 3 sides In the corner with delivery on 2 sides Any restrictions deriving from specific Laws and regulations must also be observed for example regarding fires Refer to the des...

Page 16: ...e upper surface of the plenum can not be stepped on Air can not be spread from only one side of the plenum GENERAL INFORMATION ACCESSORIES Any accessories must be original To install them follow the i...

Page 17: ...ut hole TYPE 1 2 3 pre cut hole mm 150 150 300 1 Pre cut hole 2 Circular fitting with stop not supplied 3 Secondary channelling not supplied INSTALLATION INFORMATION FUEL CONNECTION The machine should...

Page 18: ...he entire smoke duct must not rest on the appliance The flue must ensure the minimum depression required by the current technical standards considering zero pressure to the connection with the fume du...

Page 19: ...be installed in accordance with the regulations in force and be used only in a sufficiently ventilated area Check that the combustion air inlet is always free from any obstacles leaves sheets of pape...

Page 20: ...y sized according to the regulations in force Always connect the earthing system taking care to leave the earth wire slightly longer that the other wires so that in case of accidental pulling the latt...

Page 21: ...is an integral part of this instruction manual We recommend keeping it carefully together with the other documents Should this copy be mislaid ask the Manufacturer for a duplicate notifying the serial...

Page 22: ...thermostat reset button 6 Room thermostat adjustment knob INSTALLATION INFORMATION FUEL TANK Type 1 and 2 appliances feature a built in tank The type 3 appliance for reasons of operating autonomy mus...

Page 23: ...tected and solved In case of doubt please contact the closest Authorized Assistance Centre which will provide you with the necessary technical assistance INSTALLATION INFORMATION VENTILATION HEATING O...

Page 24: ...valve and make sure the burner stops During the first start up cycle the burner may stop due to the lack of fuel supply In this case wait at least 30 seconds and after unblocking the burner by pressi...

Page 25: ...the burner turns off Do not intervene on the sealings made in the factory check that the engine electric absorption value does not exceed the value specified in the plate make sure that the fan operat...

Page 26: ...rder for the machine to properly work and be maintained we suggest performing the regular cleaning and maintenance operations according to the indications in the following paragraphs Cleaning and main...

Page 27: ...Check the functionality of the safety thermostat at least quarterly Simulate its intervention and it should be verified that the burner goes out MAINTENANCE INFORMATION SECURITY CONTROL Periodically...

Page 28: ...d the door 10 after loosening the nuts 9 Using a brush clean the inside of the smoke pipes Using an aspirator remove any soot that has deposited in the rear flue gas collector and in the combustion ch...

Page 29: ...ce Toode Produsul V ro bok Proizvod BF 35 BF 75 BF 105 Wedeclarethatitiscompliantwith Sidichiarache conformea EswirdalskonformmitdenfolgendenNormen erkl rt Sedeclaraqueest enconformidadcon Nousd claro...

Page 30: ...Poland Dantherm Sp z o o 5A 62 023 Dantherm LLC ul Transportnaya 22 ownership 2 142802 STUPINO Moscow region Russia 22 2 142802 Dantherm China LTD Unit 2B 512 Yunchuan Rd Shanghai 201906 China Danther...

Reviews: