Page 15 of 20
7. Maintenance
The proposed maintenance is only a suggestion. Depending on the use of the product
and the operating environment, this may need to be revised more often.
DO NOT ATTEMPT ANY FIXES BEFORE CONSULTING DARAY.
If you cannot resolve a problem then please contact our helpline on 0800 878 9864
or email
support@daray.co.uk
7.1 Maintenance Schedule
Weekly checks
should include:-
Range of movement testing, it should be light and easy to move
throughout the range.
No visible signs of excessive wear.
Six monthly
checks to
include:-
Check all electrical connections are sound and that there is no
visible cable wear.
All fixings to be checked and be of sound construction.
7.2 Routine Maintenance
The X210 is designed and manufactured to stringent quality standards. Observing the following
procedures will help to maintain the light’s optimum performance:
-
Light-head
Clean all exterior surfaces as required, consult section 7.3 for guidance.
-
Flexible arm
Clean all exterior surfaces as required using the directions above.
If a kink is noticed in the arm, and is affecting the movement of the light, see section
5. Correct Usage, on page 12 of this manual.
-
Wall/Rail Mount
Check for security fixing of wall bracket/rail to wall structure. We advise that this is
looked at annually. If there is any looseness of the fitting to the wall, we advise that
you cease use of the light immediately and consult your building
contractor/installer/maintenance staff.
Summary of Contents for X210 LED
Page 1: ...X210 LED Examination Light Operating Installation Manual QAM X210 0818 10 X210LW ...
Page 2: ...Page 1 of 20 ...
Page 6: ...Page 5 of 20 1 2 Technical Drawings ...
Page 7: ...Page 6 of 20 ...
Page 21: ...Page 20 of 20 Service Notes ...
Page 22: ...Page 21 of 20 ...
Page 23: ...Page 22 of 20 ...