STEP 2
• Locate 2 more bars, 2 couplers, and 4 more large joiners.
• Attach 2 large joiners to each of the 2 bars, but this time slide the bars through the long channel on the
underside of the large joiners.
• Connect all 3 bars from this step, using the couplers as shown in Figure 2.2.
• Attach 2 stacking bridges to the large joiners on the left side and 2 on the right. Leave the large joiner in the
middle empty for now.
STEP 1
• Start building the set by locating and
attaching one stacking bridge to one
baseplate.
• Next, attach one end of a loop to
the
built-in track joiner on the stacking
bridge
, as shown to the right. Attach the other
end of the loop to the built-in track joiner in
front of the stacking bridge on the baseplate.
• Attach another loop
by placing one end in
the unused half of the built-in track joiner on
the baseplate, as shown to the right. Attach
the other half to the built-in track joiner to the
left of the stacking bridge, at a 90° angle.
• Next, attach a flexi-curve
to the built-in
track joiners on either side of the baseplate,
as shown.
• To complete the step, add a 14" Straight
track to the unused half of the stacking
bridge.
• Put this configuration to the side for now.
Built in
Track Joiner
FIGURE 1
First
Loop
Flexi-Curve
Stacking
Bridge
Straight Track
Large Baseplate
Attached on
Built-in Track
Joiner
Built-in
Track Joiner
Second
Loop
FIGURE 2.1
PAGE 3
• Attach 1 large joiner to 1 bar by sliding the bar
through the short channel on the underside of the
large joiner. See Figure 2.1.
The bar goes through the
SHORT CHANNEL on the
uderside of this Large Joiner
FIGURE 2.2
Underside View
long channel
Bar
Couplers
The bar goes through the
LONG CHANNELS of these 2
Large Joiners.
Stacking
Bridges
Bar
Bar
Stacking
Bridges
The bar goes through the
LONG CHANNELS of these
2 Large Joiners.
Underside View
short
channel