69
69
Loop the
Air-Assist Hose back under the Controller Board and out the left-hand side.
Insert one end of the
Air-Assist Hose through the Top Panel as indicated.
Pull the end of the
Air-Assist Hose past the Controller Board.
Only perform this stage if you have purchased the
Air-Assist accessory.
Lay out the parts listed below. Refer to the ‘PARTS Stage 6’ section.
•
Air assist pump
•
Air Assist hose
•
3x Air Assist hose clips
•
1x Intake Filter
•
2x M4x6mm screw
•
2x M4 washer
You will also need a
2.5mm Hex Tool.
AIR-ASSIST ACCESSORY
(OPTIONAL)
Step 01
Summary of Contents for Emblaser Core
Page 1: ...Emblaser Core Assembly Manual Rev 1 32 User Assembly Manual English Darkly LabsR Kit Rev 1 0 ...
Page 13: ...Step 1 04 Place the 4x Cable Management Clips in the recesses on the Rear Panel 13 ...
Page 21: ...21 Step 2 06 Assemble the four Idle Pulleys ...
Page 33: ...33 33 Step 2 16 Route the Belt around the two Lower Position Idle Pulleys as shown ...
Page 35: ...35 35 Step 2 18 Route the Belt behind lower position pulley in the Gantry Carriage ...
Page 41: ...41 41 Step 2 22 Route the Belt around the two Upper Position Idle Pulleys as shown ...
Page 42: ...42 42 Step 2 23 Pass the Belt through the Gantry Carraige and around the Motor Pulley ...
Page 43: ...43 43 Step 2 24 Route the Belt behind lower position pulley in the Gantry Carriage ...
Page 52: ...Fold the Driver Board Cover as shown in the diagram Step 3 07 52 52 ...
Page 68: ...Attach the Rubber Feet to the Base Plate as shown below Step 8 03 68 68 ...
Page 76: ...Connect Workspace Camera cable to the Controller Board socket indicated Step 03 76 76 ...