17. Reduced value (Normal operation)
Example : 16 m costs 39,00 M
19 m costs ?
39 X 19
------- = 43,31 M
16
Walk through
Sequence of the calculation
Function key
Display
---------------------------------------------------------------------
1. Kommuslel1ung
2
2. Enter
39,
X
39,00
3. Enter
19,
=
741,00
4.
:
741,00
5. Enter
16,
=
46,31
18. Interest calculation by days
Example : M 1695,00 3 3/6 % 45 days
Interest rate divisor from table or 360 : 3,375 = 106,667
Shortened interest formula :
Capital X days
1695 X 45
-------------- -------------
= 7,151
100 X Interest 100 X 106,667
Walk through
Sequence of the calculation
Function key
Display
---------------------------------------------------------------------
1. Decimal point position
3
2. Enter
1695,
X
1 695,000
3. Enter
45,
=
76 275,000
4.
:
76 275,000
5. Enter
100,
=
762,750
6.
:
762,750
7. Enter
106,667
=
7,151
19. Distribution task (3 memories)
A has been allocated a budget of 150 375.50 m. The amount is broken down
and at the same time the percentage of the loan is calculated.
Example : B 5 640,00 : 150 375,50 = 3,75 %
C 10 123,50 : 150 375,50 = 15,73 %
D 1 750,00 : 150 375,50 = 1,16 %
E 65 865,00 : 150 375,50 = 43,50 %
F 16 500,00 : 150 375,50 = 10,97 %
G 9 860,40 : 150 375,50 = 6,56 %
H 25 650,60 : 150 375,50 = 17,06 %
I 14 936,00 : 150 375,50 = 9,97 %
----------------------------------
150 375,50
100,00 %
20