Page 1: ...DART 3 D Scanner Assembly Instructions and User Manual For SVP 3DS Version 2 0 IonSense Inc 999 Broadway Suite 404 Saugus MA 01906 ...

Page 2: ...ails the steps necessary to install and use the 3 D scanner SVP 3DS for the DART SVP Contents HARDWARE 3 KEY OF 3D SCANNER PARTS 3 3D SCANNER ASSEMBLY 4 SOFTWARE 10 METHODS 11 3 D Imaging 12 3 D Scanner Glass Inserts 14 ...

Page 3: ...dware Key of 3D Scanner Parts 1 300mm Linear Rail X Rail 2 100mm Linear Rail Y Rail 3 X Rail Cradle DART SVP Source Rev 1 ONLY 4 3D Sampling Stage 5 Y Rail Cradle 6 Allen Wrenches 1 5mm 2 mm 3mm 1 2 3 5 4 6 ...

Page 4: ...faces the screw holes Reference the Hardware and Network Installation Manual v2 manual to determine the exact placement of the rail in the cradle as this procedure depends on the version and revision of the rail Using the 1 5mm Allen wrench lock the rail into position by tightening the two set screws on the front of the cradle One the rail is placed back onto the DART these set screws will be inac...

Page 5: ...reference the Hardware and Network Installation Manual v2 to determine the exact placement of the rail in the cradle Y RAIL Installation Repeat the process to attach the Y Rail to its cradle Slide the non motor end of the rail into the housing leaving it so the end of the rail is flush with the end of the cradle Again using the 1 5mm Allen wrench tighten the set screws to lock the rail in place Fi...

Page 6: ...he block onto the stage aligning the Y Rail so that the front piece of the Y rail s stage faces the cradle Tighten the two 1 5mm set screws on the back of the block to finish attachment Figure 5 Showing the alignment of the X and Y Rails before they are connected Figure 6 Secure the Y Rail to the X using a 2 5mm Allen wrench ...

Page 7: ... from the VAPUR interface Supporting the rail assembly carefully place the cradle back into the space between the MS interface and DART with the three screws on the far side of the MS Figure 7 The rail assembly attached to the DART source Figure 8 Securing the rail assembly to the DART base with the 3mm Allen wrench ...

Page 8: ...bs on the side of the DART and turn it downward three clicks so that it is now pointed downward at a 45 degree angle Tighten the knobs to lock it back into place Figure 9a and b Rev 1 Source at maximum height and 45 degree angle DART SVP Source Rev 2 Attach the SVP 45A angle module to the DART source housing Use the spinning knob to adjust to the proper height Figure 10 Rev 2 Source with SVP 45A a...

Page 9: ...crews on the back side of the rail This will hold the sample tray firmly in position Figure 11 Securing the Stage to the Y Rail Insert the longer ceramic tube into the VAPUR inlet taking care to leave a 2mm gap between the end of the ceramic tube and the API inlet Refer to the specific Vapur Flange Manual for the mass spec instrument being installed on for more details ...

Page 10: ...loaded from the IonSense website at this address http www ionsense com software If the software needs to be updated then download the file from the IonSense website and reference the DART Software Manual v3 for instructions on how to update A printed version of this software manual comes with each DART system or can be access here http www ionsense com manuals Web Software Page 19 iPod Software Pa...

Page 11: ...thod performs the same basic scan but designed specifically for our glass insert plate These inserts support liquid sampling There is both a left and right version of the software depending on the linear rail setup Before running the method be sure the Linear Rail settings are correct If they aren t the methods won t run properly To check open the Settings tab in the software open both Linear Rail...

Page 12: ...12 Once the method is selected either hit Start to begin the method or select Edit to change the various parameters Each of these methods is described in more detail on the following pages ...

Page 13: ...le Speed How fast the X rail moves over the sample X Length Length of the sample Y Start Position Y location where the sample starts Y Sample Speed How fast the Y rail moves over the sample Y Spacing Distance between rows Shutdown State The system can be kept in run or standby mode for repeated use or automatically shut down Standby Temperature If the system is kept in run or standby mode this tem...

Page 14: ...obotic option Each plate supports up to 48 samples and the placement of the inserts depends on the configuration of the 3 D scanner left or right handed These configurations allow for the DART SVP to be mounted on many instruments For Left Handed Rails In this configuration the sample plate will be introduced from the left side of the DART Source Due to the heat from the DART gun samples cannot be...

Page 15: ...d from the left side of the DART Source Due to the heat from the DART gun samples cannot be placed on every row Instead samples should be placed in every other row starting with row B The plate should be mounted with A1 positioned in the bottom right corner away from the DART Source ...

Page 16: ...re The temperature of the heater while running the method Gap Time How long the method waits in between samples leaving a gap between spectra peaks Sample Time The number of seconds the sample stays in the DART beam Shutdown State The system can be kept in run or standby mode for repeated use or automatically shut down Standby Temperature If the system is kept in run or standby mode this temperatu...