43
Observe the sight glass on the receiver. Meter refrigerant through the suction line until the level of
liquid in the receiver is approximately 1/3 from the bottom (the leveling ball in the receiver will start
to float) of the sight glass. The unit should be allowed to stabilize for 15 to 20 minutes to verify key
measurements in the table below.
Function
R-410A Conditions
Discharge Pressure
322 PSIG (2220 kPa)
Suction Pressure
104 PSIG (717 kPa)
or greater
Superheat
10 to 12°F (5.56to 6.67°C) Differential
Measure the superheat at the compressor suction line at least 6 inches (152 mm) away from the com
-
pressor. Compare suction pressure and temperature reading between the dap4 and the manifolds. If
the difference between the manifold reading and dap4 reading is more than 5%, check for the EEV
wiring and any possible alarms on dap4, or EEV driver. Measure sub-cooling at the liquid line.
When charging is complete, add the correct amount of oil, if the line run exceeds longer than 20m
or 66ft. This procedure must be conducted with the system running at high load (compressor at full
speed).
ALWAYS use original Danfoss POE oil 160SZ from new cans.
Oil addition is calculated based on refrigerant charge, shown in the table below:
Additional Oil Required (oz)
Note: Additional oil is only needed if pipe run is longer than 20m or 66ft.
Total Refrigerant Weight
(lbs.)
Danfoss Variable Speed
Compressor
Danfoss Fixed Speed
Compressor
20
12
6
30
18
9
40
25
12
50
31
15
60
37
18
70
43
21
80
49
25
90
55
28
100
61
31
110
67
34
120
74
37
130
80
40
140
86
43
150
92
46
160
98
49
170
104
52
180
110
55
Summary of Contents for gForce Ultra
Page 1: ......
Page 58: ...58 8 CONTROLS Refer to dap4 IOM for controls and control logic...
Page 63: ...63...
Page 64: ...gFUltra_IOM 09 2020...