Running a Job on PSV5000 ■ List of Steps to Start a Job
- 46 -
Data I/O ■ 096-0466-001E
Power Up the Tray Feeder
1.
Ensure the
Tray Feeder 35
utilities are plugged into the
PSV5000 Machine and the Tray Feeder power switch is in the ON posi-
tion. The Tray Feeder powers up when the PSV5000 Machine is started.
2.
To verify power, ensure the top sensors have lights (indicating power).
Figure 46:
Verify sensor lights.
Verify Tray Feeder Initialization
1.
Install up to 20 JEDEC trays of unprogrammed devices into the
Input
Stack
of the Tray Feeder.
2.
Run your job in TaskLink or LumenX Data Management Software.
3.
After CH700 starts, click the
In
and
Out
buttons to enable Tray 1 for Input
and Output.
Figure 47:
Enabling Tray 1 for Input and Output.
4.
In the right pane, click
System
, and enter the Supervisor password.