Programmers
FlashCORE Programmer Diagnostics
PSV5000 Owner’s Manual
- 119 -
Programmers
FlashCORE programmers require some maintenance to continually
program at the highest yields.
Note: For LumenX Programmer diagnostics refer to Customer Letter
983-5085-001A. Check our website Technical Library.
It is NOT necessary to restart programmers between jobs.
FlashCORE Programmer Diagnostics
To optimize programming yields, voltages within the FlashCORE
programmer need to be calibrated
once each year
. This is a more
thorough HW test than the 'POST' (Power-On-Self-Test) as well as
ensuring that each programmer's precision reference is still within its
specified operating range.
Annual programmer Compliance Verification (CV) can be performed by
Data I/O at customer sites. This on-site visit is included if you have an
APS (Annual Programmer Support) contract (customer pays travel costs).
Optionally, customer can purchase a Diagnostic Adaptor Board (DAB)
and perform the compliance diagnostics themselves. Contact sales to
purchase a DAB.
Tools required
• Diagnostic Adapter Board (DAB), Data I/O part number 910-2200-003
(or higher).
This Diagnostic Adapter Board detects problems related to FlashCORE
(FC) programmer hardware failure. The DAB tests the Waveform Circuit
Board and Backplane Circuit Board. The DAB can also be used to locate
problems that have not yet shown symptoms.
The DAB performs these nine tests:
• Bus Test
•
Vpp Overcurrent Test
•
Adapter ID Test
•
I2C Bus Test
•
LED Driver Test
• DAC Calibration Test
•
G Node Test
•
Gslew Test
•
Vcc Overcurrent Test
Summary of Contents for PSV5000
Page 12: ......
Page 36: ......
Page 160: ......
Page 161: ...Electrical Schematics for PSV5000 and Equipment ...
Page 162: ......
Page 163: ......
Page 164: ......
Page 165: ......
Page 166: ......
Page 167: ......
Page 168: ......
Page 169: ......
Page 170: ......
Page 171: ......
Page 172: ......
Page 173: ......
Page 174: ......
Page 175: ......
Page 176: ...PROGRAMMABLE MEDIA EXPERTS ...