PSV7000 Ionizer Kit
15 |
P a g e
Chapter 3: Testing the Ionizer
With the ionizer installed and ready to go, now Power-Up the system and verify functionality.
Verify Air and Power
1.
With the air supply ON, ensure the air pressure regulator shows a reading between the green
markers of
0.10
and
0.14 MPa
(15 - 20 PSI).
Verify reading on air pressure regulator.
2.
On the back of the ionizer, verify that the
ION
izer and
MAIN
tenance lights are both GREEN.
Verify GREEN status lights.