background image

InstallatIon and operatIon 9

INSTALLATION 

STANDALONE

place the unit flat. the base is the side of the unit showing the serial number and dataton logo. 

IN 19-INCH RACK

two WatCHpaX 4 units may be joined together and inserted into a 19-inch rack. 

IMportant: the two units are attached with brackets at the front. the rack must therefore be 

equipped with a shelf at the back to support the units. 

• 

Using a hex key, remove the rubber bumpers on both units and retain the screws. save the bumpers 

in case you wish to re-mount them at a later date.

• 

place the two units side-by-side and join them along the center line with the connection discs. Using 

the screws from the bumpers, first mount two discs on the top of the units. Carefully turn the unit over 

and mount the remaining two discs along the center line on the underside of the units. 

• 

IMportant: always mount all four discs to ensure the units are safely joined together.

• 

Mount the two rack brackets (or ears) on the front corners of the joined units. these can be fitted 

facing forward or backward, depending on the airflow, and cabling. 

OPERATION

POWER ON

there is no on/off switch on a WatCHpaX 4. the unit is turned on by inserting the power cord. 

note: the first time you power up the unit, WatCHpaX 4 will initiate an installation routine which 

typically takes about five minutes to complete.

POWER OFF

Unplug the power cord to turn off the unit.  

WAKE-ON-LAN

WatCHpaX 4 supports Wakeonlan which enables users to remotely power on a computer or to 

wake it up from sleep mode by a network message from WatCHoUt or WatCHnet. please see 

WatCHoUt and WatCHnet user guides for more information. 

Connection discs, 

 

four in total

Summary of Contents for Watchpax 4

Page 1: ...1 3 ...

Page 2: ... trademarks trademarks of DATATON AB All other company and product names are trade marks or registered trademarks of their respec tive owners Use of a term in this publication should not be regarded as affecting the validity of any trademark The information in this manual has been checked and is believed to be accurate How ever Dataton assumes no responsibility for any inaccuracies or errors in th...

Page 3: ...s include a strap handle rubber bumpers and Kensington security slot Two units may also be mounted together and installed in a 19 inch rack WHAT S WATCHOUT Dataton WATCHOUT is the leading multi display production and presentation software Use WATCHOUT to orchestrate images video lighting 3D and interactivity into a single impressive show The essential components of a WATCHOUT show are the software...

Page 4: ...4 IN YOUR RIG The WATCHPAX has four DisplayPort outputs Used as is it will manage four display devices in your presentation Splitters may also be used to increase the number of display devices managed As you increase the number of display devices in your show add WATCHPAX units as needed Each WATCHPAX 4 has a built in WATCHOUT license That means that if you use Dataton s dedicated media players se...

Page 5: ...wer the RTC real time clock circuitry Ethernet port RJ45 Gbit Ethernet USB ports Two USB 3 0 connectors Audio 3 5 mm stereo audio out connector Video outputs Four full size DisplayPort outputs 4K UHD playback ENVIRONMENTAL Temperature range Operating 0 to 40 C Storage and transportation 20 to 50 C Relative humidity Operating storage and transportation 10 to 90 non condensing Altitude Operating max...

Page 6: ...hold specified in the Battery Directive This product should be handed over to a designated collection point e g on an authorized one for one basis when you buy a new similar product or to an authorized collection site for recycling waste electrical and electronic equipment EEE and batteries and accumulators Improper handling of this type of waste could have a possible impact on the environment and...

Page 7: ...ap as an anchor point Do not install the product in a place where it is exposed to dust moisture oil or smoke Take care not to drop the product when moving it When installing the product on a shelf ensure the bottom edge of the product does not protrude Installing the product in an unusual place e g where the product is exposed to a lot of dust chemi cals high temperatures presence of moisture etc...

Page 8: ... try to correct the interference by one or more of the following measures Reorient or relocate the receiving antenna Increase the separation between the equipment and receiver Connect the equipment into an outlet on a circuit different from that to which the receiver is connected Consult the dealer or an experienced radio TV technician for help Use of a shielded Ethernet cable is required to compl...

Page 9: ...the unit over and mount the remaining two discs along the center line on the underside of the units IMPORTANT Always mount all four discs to ensure the units are safely joined together Mount the two rack brackets or ears on the front corners of the joined units These can be fitted facing forward or backward depending on the airflow and cabling OPERATION POWER ON There is no on off switch on a WATC...

Page 10: ...Make sure you are using version 6 1 3 or higher The WATCHPAX and any WATCHOUT display computers on the local network will be listed in Window Network Assign display and cluster names if required by double clicking an item in the list see screenshot IP NUMBER ASSIGNMENT WATCHPAX automatically retrieves an IP address via a DHCP server If no DHCP server is available the WATCHPAX will get a self assig...

Page 11: ...TE FILES To remove unused files from the WATCHPAX unit open WATCHOUT on the production computer on the network Go to the Stage menu as below Stage Manage Display Computer Delete Other Shows This deletes files from online display computers for all shows with the exception of the current open show REBUILD SHOW CACHE WATCHOUT usually manages the cached data associated with the current open show autom...

Reviews: