29
(preferably two) connections with an RSSI of 17 or more. If not, you need to
reposition your node closer to the others or in a better line through fewer walls. You
may need to add new nodes.
On the Node List: the number of Hops should be three or less (fewer is better). If
not, you need to add additional gateways or reposition nodes.
Troubleshooting with your device with lights
The LED on your device can tell you a lot about how that device is functioning. The
meaning of the LED light for the AP440 is as follows:
Common States (Gateway and Repeater)
STATE COLOR
Boot loader
Solid Purple
Booting Up
Solid Yellow
Firmware upgrade (node is executing the firmware upgrade) Solid Red
Cloud check-in failure
Flash White
Key re-pair
Flash Yellow
Configuration change AP not ready
Solid White
Net failure - no default route
Flash Red
10.
Additional Resources
To learn more about planning and optimizing your network, download the
Datto
Network Planning Guide
.
To learn more about Datto's splash page feature, download the
Using the Splash
Page Editor Guide
.
To learn more about Datto's vouchers feature, download the
Using Vouchers in
Network Manager Guide
.
To learn more about integrating vouchers with PayPal, download the
Using PayPal in Network Manager
Guide
.
For any information or datasheets please log into the Datto Partner Portal and view the
Corresponding KB articles at help.datto.com