The 1026 marked beams will be installed on
the door side (Front) and opposite rear side.
Desk and Power can be installed on the rear.
The 1028 marked beams will be installed on
the sides (left and right) of the Cube. If the desk
is to be installed on the left or right, the beam
with the cut out
must
be installed on the
desk + power side.
One of the top traverse beams in each size (1026 and 1028) will have a cutout for power wiring to go
through this beam and the Tech panel.
The Desk and Power Tech Panel is commonly installed on the side adjacent to the door hinges (left side),
but can also be installed on the rear or the right side.
LOCATION OF THE TECH PANEL FOR DESK AND POWER
POWER CUTOUT IN TOP TRAVERSE BEAM
1026mm
1026mm
(NO CUTOUT)
(REAR WITH CUTOUT)
TRAVERSE BEAM POWER CUTOUTS