INSTALL THE PANELS INTO SKELETON FRAME
Push panel into frame. To facilitate,
use clamp.
Feed the GST through the panel cutout
if the power comes from inside.
4
5
PER STEP
Insert the Tech Panel
from the bottom on an
angle.
Do not fully tighten
the screws.
Repeat 5.a - 5.c for all Panels.
PLACE SKELETON ON FLOOR BASE & PREPARE UNIT FOR PANELS
Firmly tighten all panels once the panels and leveling
glides are in their correct locations
If necessary, use a flat
pallet knife to push in
the rubber gaskets.
5.a
USE 8MM
HEX BIT WITH
EXTENSION
5.d
INSTALL POWER SOURCE CABLE IN TECH PANEL IF POWER IS COMING FROM THE
FLOOR
(DISREGARD IF POWER SOURCE IS OUTSIDE THE CUBE)
5.b
5.c