S B C X U s e r ' s G u i d e
v . 1 . 0 . 1
6
Getting started
This chapter describes how to quickly start working with the development
kit. The following paragraphs will guide you through the setup and
installation procedures.
6.1
Unboxing
Once you've received the kit, please open the box and check the kit
contents with the packing list included in the box, using the table on
chapter 6.1.1 as a reference. The hardware components (SOM, carrier
boards and display) are pre-assembled, as shown in the picture below:
December, 2019
68/139
Summary of Contents for SBC AXEL
Page 2: ...S B C X U s e r s G u i d e v 1 0 1 Page intentionally left blank December 2019 2 139 ...
Page 105: ...S B C X U s e r s G u i d e v 1 0 1 December 2019 105 139 ...
Page 106: ...S B C X U s e r s G u i d e v 1 0 1 December 2019 106 139 ...
Page 107: ...S B C X U s e r s G u i d e v 1 0 1 December 2019 107 139 Fig 44 QtQuick Hello World ...
Page 119: ...S B C X U s e r s G u i d e v 1 0 1 December 2019 119 139 ...
Page 121: ...S B C X U s e r s G u i d e v 1 0 1 December 2019 121 139 ...
Page 139: ...S B C X U s e r s G u i d e v 1 0 1 December 2019 139 139 ...