Mounting the Temp/Hum Station
9
Mounting on a Vertical Surface
1. Using four 1/4" x 1-1/2" lag screws (not included), attach the mounting
bracket to the surface in the desired location.
Drill holes using a 3/16" (5 mm) drill bit. Use a carpenter’s level when mark-
ing the holes, to ensure that the bracket will be level.
2. Slide the stud ends protruding from the top of the station through the holes
on the mounting bracket.
3. Secure the station to the mounting bracket using a #8 flat washer, #8 split
lock washer and #8 hex nut on each of the stud ends.
Tighten the hex nuts until the station is secure on the mounting bracket.
Mounting the Temp/Hum Station to a Vertical Surface
1/4" x 1-1/2" Lag Screws
(not included)
Cable Clip
Cable Tie