ON / OFF
Menu Exit / changing
Temperature increase / up
Temperature decreasing /down
Reset / Timer ON OFF
First operation of the device must absolutely made by Authorized
Service.
Our company is not responsible from damages and accidents which
can be occur associated with intervention to device by unauthorized people.
Before operating the device, suitability of all connections of mechanics and
electrical must be controlled. Heating system must have between1 and 2 bar
pressure flowage for device.Our company is not responsible from damages
and accidents which can be occur because of wrong connection.
Follow following points for the operation of device.
6.3 Operation of the Device