18
INSTALLATION INSTRUCTIONS
●
●
Disconnect the cable from inside the downdraft unit. Plug in that same cable
from the downdraft unit into the internal blower Fig.12.
●
●
Remove the vent collar from the blower box and close the opening with
the cover removed from the back of the downdraft unit. Attach it
with four screws Fig.13.
●
●
Mount the vent collar on the back of the downdraft unit Fig.14.
●
●
Mount the blower box to the downdraft unit with four screws
Fig.15.
●
●
Continue to the ‘Prepare for electrical connection’ section on page 21.
Option 3: Internal blower, back installation for venting left, right or down
●
●
The internal blower box can also be installed on the back of the downdraft unit
to accommodate the installation of a cooking range, range top or wall oven /
cooktop in front of the downdraft unit.
●
●
Remove the large cover on the back of the downdraft unit Fig.16.
●
●
Turn the venting collar on the blower box to the desired direction - left, right or
down. Disconnect the cable from inside the downdraft unit. Plug in that same
cable from the downdraft unit into the internal blower and mount the blower box
to the housing using four screws Fig.17.
●
●
When finished, mount the previously removed cover onto the front of the
downdraft unit Fig.18.
●
●
Continue to the ‘Prepare for electrical connection’ section on page 21.
Fig.13
Fig.15
Fig.14
Fig.12
BA
CK
FRONT
BA
CK
Fig.16
BA
CK
Fig.17
FRONT
Fig.18
Summary of Contents for HBD1200E
Page 2: ...English Page 1 35 Français Page 37 71 ...
Page 4: ......
Page 33: ...31 WIRING DIAGRAM Downdraft unit wiring diagram EN ...
Page 34: ...32 WIRING DIAGRAM Remote blower wiring diagram ...
Page 38: ......
Page 40: ......
Page 74: ......
Page 75: ......