PLANNING THE INSTALLATION
5
RECOMMENDED INSTALLATION INSTRUCTION
Install components in the following order:
A) Vent Hood
B) Backguard System
C) Range
1) Locate and level range according to range installation instructions.
2) Measure distance from floor to top of island trim on range, adding 1/8” for backguard clearance.
3) Transfer this measurement to the wall. This will mark the bottom of your backguard.
4) From this line measure 28” up wall to mark top of 30” backguard. This is the minimum height
that the bottom of your vent hood can be installed.
6) Follow vent hood manufacturer’s installation instructions to install vent hood.
7) Follow backguard installation instructions to install backguard.
8) Connect gas and electric connections and slide range into position.
STEP 1:
MOVING AND PLACING THE RANGE
The ranges have shipping weights varying from
420lbs. to 630lbs less approx. 50lbs. after removal of
packing material.
It is recommended that the
door(s), grates, front kick panel, and drip pan (below
knobs) be removed to facilitate handling. This will
reduce the weight for ease of handling.
UNPACKING AND HANDLING
Kick Panel
Fig. 1
Kick Panel
Summary of Contents for RDS-305
Page 19: ...RDS 48 WIRING DIAGRAM 18 17468 01 eps Rev A 08 02 ...
Page 20: ...RDS 48 SCHEMATIC 19 17468 02 eps Rev A 08 02 ...
Page 21: ...RDS 36 WIRING DIAGRAM 20 17469 01 eps Rev A 08 02 ...
Page 22: ...RDS 36 SCHEMATIC 21 17469 02 eps Rev A 08 02 ...
Page 23: ...RDS 485 WIRING DIAGRAM 22 17580 01 eps Rev A 08 02 ...
Page 24: ...RDS 485 SCHEMATIC 23 17580 02 eps Rev A 08 02 ...
Page 25: ...RDS 305 WIRING DIAGRAM 24 17470 01 eps Rev A 08 02 ...
Page 26: ...RDS 305 SCHEMATIC 25 17470 02 eps Rev A 08 02 ...
Page 29: ...NOTES 28 ...