5.3 Total Call Concept (TCC) Procedure
5.3.1 200K Maintenance Procedure
Table 5–2 shows the FRUs that after 200,000 pages should be inspected
for wear and if necessary replaced. There is no required or mandatory
maintenance procedure, no special visits to the customer’s site. Make sure to
record the event in the maintenance log.
Table 5–2 200K Maintenance Procedure
FRU Name
Part Number
R&R Section
Number
Fusing unit
FD–41594–01 (115 Vac)
FD–41595–01 (220 Vac)
9.25
Pad, front tray separation
FD–41622–01
9.30
Roller, cassette pickup
FD–41629–01
9.32
Roller, front tray pickup
(MP tray pickup roller)
FD–41630–01
9.33
Roller, LCIT pickup
FD–41631–01
9.34
Roller transfer
FD–41633–01
9.31
Start FIP and Total Call Concept 5–7
Summary of Contents for DEClaser 5100
Page 10: ......
Page 13: ...DSG 000172 Notes 1 ...
Page 14: ......
Page 61: ...2 5 HVPSA Figure 2 12 EP ED Cartridge DSG 000612 2 1 3 4 5 6 7 Technical Description 2 25 ...
Page 62: ...2 5 HVPSA DSG 000172 Notes 2 26 Technical Description ...
Page 70: ...3 2 Control Panel Operation DSG 000172 Notes 3 8 Operating the Control Panel ...
Page 90: ......
Page 124: ...7 5 Phantom Jams DSG 000172 Notes 7 8 FIPs for Fixing Paper Jams ...
Page 167: ...9 12 Board DC Control 1 2 4 5 7 8 9 6 3 10 DSG 000657 Removing and Replacing FRUs 9 31 ...
Page 224: ...10 1 Field Replaceable Units DSG 000172 Notes 10 4 FRU Part Numbers ...
Page 254: ...B 4 Connecting to OpenVMS VAX or ULTRIX Systems DSG 000172 Notes B 10 General Information ...
Page 264: ...D 3 Tools DSG 000172 Notes D 4 Training Documentation and Tools ...
Page 274: ......